A model for a production-repair system under a time-varying demand process

被引:23
|
作者
Omar, Mohd [1 ]
Yeo, Ivan [1 ]
机构
[1] Univ Malaya, Inst Math Sci, Kuala Lumpur 50603, Malaysia
关键词
Inventory; Production; Time-varying demand; Reuse; WASTE-DISPOSAL PROBLEM; EOQ REPAIR; INVENTORY SYSTEM; SETUP NUMBERS; RECOVERY;
D O I
10.1016/j.ijpe.2009.01.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we consider a production system that satisfies a continuous time-varying demand for a finished product over a known and finite planning horizon by supplying either new products or repaired used products. Our model assumes that new products are fabricated from a single type of raw material procured from external suppliers, while used products are collected from the customers and then repaired to ail 'as new' condition before being sold again. However, we assume that there is no further collection of used products during the period when they are being repaired or shipped. The problem is to determine a joint policy for raw materials procurement, new products production and used products repair such that the total relevant cost of the system is minimized. We propose a numerical solution procedure based oil Microsoft Excel Solver's nonlinear mathematical programming function. Then, the procedure is illustrated with a numerical example. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:17 / 23
页数:7
相关论文
共 50 条
  • [21] On an inventory model for deteriorating items and time-varying demand
    Benkherouf, L
    Balkhi, ZT
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 1997, 45 (02) : 221 - 233
  • [22] Nonlinear time-varying system identification based on time-varying NARMA model
    Pang, Shi-Wei
    Yu, Kai-Ping
    Zou, Jing-Xiang
    Gongcheng Lixue/Engineering Mechanics, 2006, 23 (12): : 25 - 29
  • [23] VIBRATION ANALYSIS OF SHIP SHAFT SYSTEM UNDER TIME-VARYING UNCERTAINTIES BASED ON INTERVAL PROCESS MODEL
    Shang, Baoyou
    Li, Tianyun
    Zhu, Xiang
    Wang, Jianing
    PROCEEDINGS OF ASME 2024 43RD INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, OMAE2024, VOL 2, 2024,
  • [24] Dynamic Modeling and Simulation of the Fuel Delivery Process Under Time-Varying Tokamak Fuel Demand
    Lee, Jae-Uk
    Chang, Min Ho
    Kang, Hyun-Goo
    Chung, Dong-You
    Yun, Sei-Hun
    Lee, Suh-Young
    Lee, In-Beum
    FUSION SCIENCE AND TECHNOLOGY, 2019, 75 (08) : 1046 - 1052
  • [25] INVENTORY CONTROL UNDER A PROBABILISTIC TIME-VARYING, DEMAND PATTERN
    SILVER, E
    AIIE TRANSACTIONS, 1978, 10 (04): : 371 - 379
  • [26] An imperfect production model with shortage and screening constraint under time varying demand
    Madhusudan Dolai
    Shyamal Kumar Mondal
    International Journal of System Assurance Engineering and Management, 2024, 15 : 1183 - 1202
  • [27] An imperfect production model with shortage and screening constraint under time varying demand
    Dolai, Madhusudan
    Mondal, Shyamal Kumar
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2024, 15 (03) : 1183 - 1202
  • [28] An uncooperative ordering policy with time-varying price and learning curve for time-varying demand under trade credit
    Wu, Chengfeng
    Zhao, Qiuhong
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (03) : 380 - 402
  • [29] Evaluation model of time-varying availability for combat units under finite repair capacity
    Xu L.
    Li Q.
    Li H.
    Shao S.
    Li, Qingmin (licheng001@hotmail.com), 1600, National University of Defense Technology (38): : 114 - 121
  • [30] Preventive maintenance of a batch production system under time-varying operational condition
    Hu, Jiawen
    Jiang, Zuhua
    Liao, Haitao
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (19) : 5681 - 5705