Application of Risk Significance Index Score to Construction Projects in Malaysia

被引:0
作者
Goh, Boon Hoe [1 ]
Kang, Byung Gyoo [1 ]
Liew, Chung Lian [1 ]
Choong, Wee Kang [1 ]
Yeong, Tuck Wai [1 ]
机构
[1] Univ Nottingham, Dept Civil Engn, Semenyih 43500, Selangor, Malaysia
来源
CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4 | 2014年 / 838-841卷
关键词
risk; score; project; construction; Malaysia; MANAGEMENT;
D O I
10.4028/www.scientific.net/AMR.838-841.3102
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Risk management is one of the most important areas in project management particularly in the construction industry. However it is not possible to analyze all of the potential risks as it will require too much time and effort. Therefore in order to identify and analyze the significant risks, the risks should be categorized and ranked. This research applied the concept of risk significance index score to construction projects in Malaysia. A comprehensive list of 40-potential risks has been developed through literature review and an interview survey. A questionnaire survey was conducted to produce project risk significance index score for the risks. The ranks of the risks have been identified and solutions for the significant risks have been produced through interviews. This research proves the practical use of risk significance index score for construction projects in Malaysia.
引用
收藏
页码:3102 / 3108
页数:7
相关论文
共 50 条
  • [21] Impact of Risk Attitude on Risk, Opportunity, and Performance Assessment of Construction Projects
    Qazi, Abroon
    Daghfous, Abdelkader
    Khan, M. Sajid
    PROJECT MANAGEMENT JOURNAL, 2021, 52 (02) : 192 - 209
  • [22] The Impacts of Operational Risks in the Supply Chain of Construction Projects in Malaysia
    Shahbaz, Mumammad Saeed
    Qureshi, Muhammad Asif
    Sohu, Samiullah
    Keerio, Manthar Ali
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2020, 27 (06): : 1887 - 1893
  • [23] Site Inspection Practice in Construction Projects in Kuala Lumpur, Malaysia
    Zulkifli, A. R.
    Yahya, N. A.
    Azmi, E. A.
    Diah, J. Md
    ADVANCES IN CIVIL ENGINEERING AND SCIENCE TECHNOLOGY, 2018, 2020
  • [24] The significant factors causing delay of building construction projects in Malaysia
    Alaghbari, Wa'el
    Kadir, Mohd. Razali A.
    Salim, Azizah
    Ernawati
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) : 192 - +
  • [25] Revisiting critical delay factors for construction: Analysing projects in Malaysia
    Yap, Jeffrey Boon Hui
    Goay, Pei Ling
    Woon, Yoke Bee
    Skitmore, Martin
    ALEXANDRIA ENGINEERING JOURNAL, 2021, 60 (01) : 1717 - 1729
  • [26] Factors influencing the construction time of civil engineering projects in Malaysia
    Othman, Ahmad
    Torrance, Johan
    Hamid, Munshi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2006, 13 (05) : 481 - +
  • [27] Simulation-based approach for risk assessment in onshore wind farm construction projects
    Mohamed, Emad
    Seresht, Nima Gerami
    Hague, Stephen
    AbouRizk, Simaan M.
    2020 ASIA-PACIFIC INTERNATIONAL SYMPOSIUM ON ADVANCED RELIABILITY AND MAINTENANCE MODELING (APARM), 2020,
  • [28] Methodology and tools for risk evaluation in construction projects using Risk Breakdown Structure
    Rasool, Mehdizadeh
    Franck, Taillandier
    Denys, Breysse
    Halidou, Niandou
    EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2012, 16 : S78 - S98
  • [29] Application of lean for early identification and avoidance of disputes in construction projects
    Jagannathan, Murali
    Malla, Vijayeta
    Delhi, Venkata Santosh Kumar
    Renganaidu, Venkatesan
    CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [30] Evaluating the critical safety factors causing accidents in downstream oil and gas construction projects in Malaysia
    Waqar, Ahsan
    Othman, Idris
    Shafiq, Nasir
    Mansoor, Muhammad Shoaib
    AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (01)