Numerical study on crack problems in segments of shield tunnel using finite element method

被引:97
作者
Chen, J. S. [1 ,2 ]
Mo, H. H. [1 ]
机构
[1] S China Univ Technol, Dept Civil Engn, Guangzhou 510640, Peoples R China
[2] S China Univ Technol, State Key Lab Subtrop Bldg Sci, Guangzhou 510641, Peoples R China
关键词
Crack problem; Segment; Shieldtunnel; Finite element method;
D O I
10.1016/j.tust.2008.05.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Crack problems of segments of shield tunnel are analyzed under the conditions of construction stage and service stage. 3D finite element method was adapted to establish elaborate numerical models of segments. For crack problems in construction stage, two models were used to analyze the following contents: (1) crack states of segments under jacking forces: (2) crack states of segments when two segments relatively twist. For crack problems in service stage, first, different external forces acting on segments are abstracted to seven computational models, then crack distribution of these models were analyzed. The analysis results indicate, in construction stage and service stage, cracks mainly appear in circumferential seam, bolt holes and hand holes of segments. Under normal load level, no cracks appear in inner arc and outer arc of segment surfaces. Improving the anti-crack performance of concrete near hand holes and bolt holes, the probability of crack and breakage can be effectively reduced, which can save maintenance expense in service period. (C) 2008 Published by Elsevier Ltd.
引用
收藏
页码:91 / 102
页数:12
相关论文
共 12 条
  • [1] *ADINA R D INC, 2005, THEOR MOD GUID, V1
  • [2] *ANSYS INC, 2004, RES 8 1 DOC ANSYS ST
  • [3] Three-dimensional structural analyses of the shield-driven "Green Heart" Tunnel of the High-Speed Line South
    Blom, CBM
    van der Horst, EJ
    Jovanovic, PS
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1999, 14 (02) : 217 - 224
  • [4] Repair of displaced shield tunnel of the Taipei rapid transit system
    Chang, CT
    Wang, MJ
    Chang, CT
    Sun, CW
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2001, 16 (03) : 167 - 173
  • [5] *DES I GUANGZH MET, 2002, CONSTR DOC DES LIN 3
  • [6] An analytical solution for a jointed shield-driven tunnel lining
    Lee, KM
    Hou, XY
    Ge, XW
    Tang, Y
    [J]. INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 2001, 25 (04) : 365 - 390
  • [7] LI ZN, 2001, 14 M COUNC FAST TRAC
  • [8] MO, 2007, TUNNELING UNDERGROUN, DOI DOI 10.1016/J.TUST.2007.06.007
  • [9] [莫海鸿 Mo Haihong], 2007, [华南理工大学学报. 自然科学版, Journal of South China University of Technology. Natural Science Edition], V35, P116
  • [10] Protosenya AG, 2002, J MIN SCI+, V38, P418