BIM-Based Educational and Facility Management of Large University Venues

被引:27
作者
Munoz Pavon, Ruben [1 ]
Arcos Alvarez, Antonio A. [2 ]
Alberti, Marcos G. [1 ]
机构
[1] Univ Politecn Madrid, Dept Ingn Civil, Construcc, ETS Ingn Caminos Canales & Puertos, E-28040 Madrid, Spain
[2] Univ Politecn Madrid, Dept Ingn & Morfol Terreno, ETS Ingn Caminos Canales & Puertos, E-28040 Madrid, Spain
来源
APPLIED SCIENCES-BASEL | 2020年 / 10卷 / 22期
关键词
building information modeling BIM; BIM infrastructure; BIM data management; facility management; monitoring systems; BUILDING INFORMATION MODEL; LIFE-CYCLE; CHALLENGES; IOT; FRAMEWORK; INTERNET;
D O I
10.3390/app10227976
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The aim of this paper was to provide a Building Information Modeling (BIM)-based management system for the Civil Engineering School (ETSICCP) at the Universidad Politecnica de Madrid with a long-term development perspective. A Building Information Modeling (BIM) management system for complex infrastructure facilities demands a detailed 3-Dimensional model according to future management requirements. In this study, the infrastructure of the ETSICCP was modeled on various phases and synchronized with not only external educational information but also with facility management (FM) parameters. The methodology followed in this study ranges from the blank paper to a BIM-based detailed FM system oriented to educational scheduling throughout the infrastructure providing real time information synchronized with spreadsheets and a 3-D model. The result of this paper provides multiples future management lines, like COVID-19 BIM-management or synchronization with local public transports' applications (mainly metro and bus transport systems), through a public accessible Application Programming Interface (API). The significance of this research relies on the generation of an information and management system, based on a BIM model of a university campus. This project was designed for all the agents involved in its operation, students, lecturers, and managers. All these agents have a level of access appropriate to their needs and functions within the institution.
引用
收藏
页码:1 / 28
页数:28
相关论文
共 102 条
[1]  
Abdelwahab H.T., 2017, International Road Federation (IRF) Examiner, V12, P21
[2]  
Adamkó A, 2014, 2014 5th IEEE Conference on Cognitive Infocommunications (CogInfoCom), P505, DOI 10.1109/CogInfoCom.2014.7020509
[3]   Economic and environmental assessment of deconstruction strategies using building information modeling [J].
Akbarnezhad, A. ;
Ong, K. C. G. ;
Chandra, L. R. .
AUTOMATION IN CONSTRUCTION, 2014, 37 :131-144
[4]  
Akcamete A., 2010, P 13 INT C COMP CIV
[5]   A formalism for utilization of sensor systems and integrated project models for active construction quality control [J].
Akinci, B ;
Boukamp, F ;
Gordon, C ;
Huber, D ;
Lyons, C ;
Park, K .
AUTOMATION IN CONSTRUCTION, 2006, 15 (02) :124-138
[6]  
Al Shimmary M.K., 2015, INT J COMPUT APPL, V112, P975
[7]  
Alashwal A.M., 2014, Developing a Conceptual Framework of Fragmentation in Construction
[8]   Survey: Toward A Smart Campus Using the Internet of Things [J].
Alghamdi, Abdullah ;
Shetty, Sachin .
2016 IEEE 4TH INTERNATIONAL CONFERENCE ON FUTURE INTERNET OF THINGS AND CLOUD (FICLOUD 2016), 2016, :237-241
[9]  
Amaro G.G., 2017, INGENIO, P51
[10]  
Anjomshoaa A., 2014, S4SC 14 P 5 INT C SE