Automated BIM schedule generation approach for solving time-cost trade-off problems

被引:20
|
作者
ElMenshawy, Mohamed [1 ]
Marzouk, Mohamed [1 ]
机构
[1] Cairo Univ, Cairo, Egypt
关键词
Building information modeling; Schedule generation; Optimization; Genetic algorithm; Time-cost trade-off; CONSTRUCTION; ALGORITHM;
D O I
10.1108/ECAM-08-2020-0652
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Nowadays, building information modeling (BIM) represents an evolution in the architecture, engineering and construction (AEC) industries with its various applications. BIM is capable to store huge amounts of information related to buildings which can be leveraged in several areas such as quantity takeoff, scheduling, sustainability and facility management. The main objective of this research is to establish a model for automated schedule generation using BIM and to solve the time-cost trade-off problem (TCTP) resulting from the various scenarios offered to the user. Design/methodology/approach A model is developed to use the quantities exported from a BIM platform, then generate construction activities, calculate the duration of each activity and finally the logic/sequence is applied in order to link the activities together. Then, multiobjective optimization is performed using nondominated sorting genetic algorithm (NSGA-II) in order to provide the most feasible solutions considering project duration and cost. The researchers opted NSGA-II because it is one of the well-known and credible algorithms that have been used in many applications, and its performances were tested in several comparative studies. Findings The proposed model is capable to select the near-optimum scenario for the project and export it to Primavera software. A case study is worked to demonstrate the use of the proposed model and illustrate its main features. Originality/value The proposed model can provide a simple and user-friendly model for automated schedule generation of construction projects. In addition, opportunities related to the interface between an automated schedule generation model and Primavera software are enabled as Primavera is one of the most popular and common schedule software solutions in the construction industry. Furthermore, it allows importing data from MS Excel, which is used to store activities data in the different scenarios. In addition, there are numerous solutions, each one corresponds to a certain duration and cost according to the performance factor which often reflects the number of crews assigned to the activity and/or construction method.
引用
收藏
页码:3346 / 3367
页数:22
相关论文
共 50 条
  • [1] Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis
    Gelisen, Gokhan
    Griffis, F. H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (04)
  • [2] AN IMPROVED TIME-COST TRADE-OFF MODEL WITH OPTIMAL LABOR PRODUCTIVITY
    Lin, Chien-Liang
    Lai, Yu-Che
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (02) : 113 - 130
  • [3] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8) : 811 - 822
  • [4] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [5] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [6] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [7] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [8] Modeling project time-cost trade-off in fuzzy random environment
    Ke, Hua
    Ma, Junjie
    APPLIED SOFT COMPUTING, 2014, 19 : 80 - 85
  • [9] Time-Cost Trade-off Problems of Engineering Project with Running Income
    Li, Hongxian
    Ouyang, Hongxiang
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 9 - +
  • [10] Time-cost trade-off analysis of project networks in fuzzy environments
    Chen, Shih-Pin
    Tsai, Ming-Jiun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (02) : 386 - 397