A Hybrid Artificial Bee Colony Algorithm with Local Search for Flexible Job-Shop Scheduling Problem

被引:28
作者
Thammano, Arit [1 ]
Phu-ang, Ajchara [1 ]
机构
[1] King Mongkuts Inst Technol Ladkrabang, Fac Informat Technol, Computat Intelligence Lab, Bangkok 10510, Thailand
来源
COMPLEX ADAPTIVE SYSTEMS: EMERGING TECHNOLOGIES FOR EVOLVING SYSTEMS: SOCIO-TECHNICAL, CYBER AND BIG DATA | 2013年 / 20卷
关键词
Flexible job-shop scheduling problem; Hybrid algorithm; Artificial bee colony algorithm; Local search technique; Swarm intelligence;
D O I
10.1016/j.procs.2013.09.245
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a hybrid artificial bee colony algorithm for solving the flexible job-shop scheduling problem (FJSP) with the criteria to minimize the maximum completion time (makespan). In solving the FJSP, we have to focus on two sub-problems: determining the sequence of the operations and selecting the best machine for each operation. In the proposed algorithm, first, several dispatching rules and the harmony search algorithm are used in creating the initial solutions. Thereafter, one of the two search techniques is randomly selected with a probability that is proportional to their fitness values. The selected search technique is applied to the initial solution to explore its neighborhood. If a premature convergence to a local optimum happens, the simulated annealing algorithm will be employed to escape from the local optimum. Otherwise, the filter and fan algorithm is utilized. Finally, the crossover operation is presented to enhance the exploitation capability. Experimental results on the benchmark data sets show that the proposed algorithm can effectively solve the FJSP. (C) 2013 The Authors. Published by Elsevier B.V.
引用
收藏
页码:96 / 101
页数:6
相关论文
共 50 条
[31]   Bilevel neighborhood search hybrid algorithm for the flexible job shop scheduling problem [J].
Zhao, Shikui .
Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2015, 51 (14) :175-184
[32]   Research on the performance of harmony search with local search algorithms for solving flexible job-shop scheduling problem [J].
Li, Jia ;
Xue, Shuaihao ;
Li, Minghui ;
Shi, Xiaoqiu .
Journal of Intelligent and Fuzzy Systems, 2025, 48 (03) :291-304
[34]   Artificial bee colony algorithm for solving a bi-objective job shop scheduling problem [J].
Zhang R. .
Advances in Information Sciences and Service Sciences, 2011, 3 (08) :319-326
[35]   A MIP model and a hybrid genetic algorithm for flexible job-shop scheduling problem with job-splitting [J].
Tutumlu, Busra ;
Sarac, Tugba .
COMPUTERS & OPERATIONS RESEARCH, 2023, 155
[36]   A novel hybrid method for solving flexible job-shop scheduling problem [J].
Ning T. ;
Guo C. ;
Chen R. ;
Jin H. .
Open Cybernetics and Systemics Journal, 2016, 10 :13-19
[37]   An Improved Social Spider Algorithm for the Flexible Job-Shop Scheduling Problem [J].
Wang, Yao ;
Zhu, Linbo ;
Wang, Jiwen ;
Qiu, Jianfeng .
PROCEEDINGS OF 2015 INTERNATIONAL CONFERENCE ON ESTIMATION, DETECTION AND INFORMATION FUSION ICEDIF 2015, 2015, :157-162
[38]   A two-stage hybrid algorithm for flexible job-shop scheduling [J].
Gao Li ;
Xu Ke-lin ;
Zhu Wei ;
Yang Na-na .
COMPUTATIONAL MATERIALS SCIENCE, PTS 1-3, 2011, 268-270 :476-481
[39]   An Improved Ant Colony Algorithm is Proposed to Solve the Single Objective Flexible Job-shop Scheduling Problem [J].
Huang, Ming ;
Guo, Dongsheng ;
Liang, Xu ;
Liang, Xiuyan .
2020 IEEE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2020, :16-21
[40]   An Adaptive Multi-population Artificial Bee Colony Algorithm for Multi-objective Flexible Job Shop Scheduling Problem [J].
Cao, Yang ;
Shi, Haibo .
PROCEEDINGS OF THE 2019 31ST CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2019), 2019, :3822-3827