共 50 条
[31]
Bilevel neighborhood search hybrid algorithm for the flexible job shop scheduling problem
[J].
Jixie Gongcheng Xuebao/Journal of Mechanical Engineering,
2015, 51 (14)
:175-184
[34]
Artificial bee colony algorithm for solving a bi-objective job shop scheduling problem
[J].
Advances in Information Sciences and Service Sciences,
2011, 3 (08)
:319-326
[37]
An Improved Social Spider Algorithm for the Flexible Job-Shop Scheduling Problem
[J].
PROCEEDINGS OF 2015 INTERNATIONAL CONFERENCE ON ESTIMATION, DETECTION AND INFORMATION FUSION ICEDIF 2015,
2015,
:157-162
[38]
A two-stage hybrid algorithm for flexible job-shop scheduling
[J].
COMPUTATIONAL MATERIALS SCIENCE, PTS 1-3,
2011, 268-270
:476-481
[39]
An Improved Ant Colony Algorithm is Proposed to Solve the Single Objective Flexible Job-shop Scheduling Problem
[J].
2020 IEEE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT),
2020,
:16-21
[40]
An Adaptive Multi-population Artificial Bee Colony Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
[J].
PROCEEDINGS OF THE 2019 31ST CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2019),
2019,
:3822-3827