Risk Assessment of Electromagnetic Spectrum Utilization Based on Analytic Hierarchy Process (AHP) and Borda method

被引:0
作者
Li, You [1 ]
Zhu, Xuan [1 ]
Wu, Bing [1 ]
Jiang, Shui-qiao [1 ]
Liu, Han [1 ]
机构
[1] Natl Univ Def Technol, Coll Informat & Commun, Wuhan 430010, Peoples R China
来源
2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC) | 2021年
关键词
Risk assessment; Spectrum utilization; Analytic hierarchy process (AHP); Borda ordinal value;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Risk assessment plays an important role in the risk management of electromagnetic spectrum utilization. The risk level is mainly determined by the probability of the occurrence of the risk and the severity of the risk consequence. In this paper, we adopted the Analytic Hierarchy Process to evaluate the spectrum utilization risk criteria and the severity of the risk consequence. Then the Borda ordinal value method is used to calculate the risk level of spectrum utilization risk. The result showed that this method is more accurate in assessing the level of risk than the risk matrix method.
引用
收藏
页码:189 / 193
页数:5
相关论文
共 17 条
[1]  
Al-Samman AM, 2015, 2015 9th European Conference on Antennas and Propagation (EuCAP)
[2]  
Gulati K., 2009, STAT MODELING CO CHA
[3]  
He Yi, 2008, Journal of Projectiles, Rockets, Missiles and Guidance, V28, P272
[4]  
LI Kun, 2008, Wireless Communication Technology, V17, P10, DOI [10.3969/j.issn.1003-8329.2008.01.003, DOI 10.3969/J.ISSN.1003-8329.2008.01.003]
[5]   Risk Matrix for Factors Affecting Time Delay in Road Construction Projects: Consultants' Perspective [J].
Mahamid, Ibrahim .
COMPUTATIONAL MECHANICS, MATERIALS AND ENGINEERING APPLICATIONS, 2012, 147 :244-248
[6]  
Malone R. W. J., 2004, DEV RISK ASSESSMENT
[7]   A Fuzzy Adaptive Dynamic NSGA-II With Fuzzy-Based Borda Ranking Method and its Application to Multimedia Data Analysis [J].
Orouskhani, Maysam ;
Shi, Daming ;
Cheng, Xiaochun .
IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2021, 29 (01) :118-128
[8]   IMPROVED ASSESSMENT OF INTERFERENCE LIMITS IN CELLULAR RADIO PERFORMANCE [J].
PRASAD, R ;
KEGEL, A .
IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 1991, 40 (02) :412-419
[9]   Safety risk identification and prioritize of forest logging activities using analytic hierarchy process (AHP) [J].
Unver, Saliha ;
Ergenc, Ibrahim .
ALEXANDRIA ENGINEERING JOURNAL, 2021, 60 (01) :1591-1599
[10]  
Wu Yanhong, 2009, FORGE ELECT MEASUREM