Enhancing project delivery performances in construction through experiential learning and personal constructs: competency development

被引:13
作者
Yap, Jeffrey Boon Hui [1 ,2 ]
Shavarebi, Kamran [2 ]
机构
[1] Univ Tunku Abdul Rahman, Lee Kong Chian Fac Engn & Sci, Dept Surveying, Kajang, Malaysia
[2] Int Univ Malaya Wales, Fac Sci Technol Engn & Math, Kuala Lumpur, Malaysia
关键词
Project management; knowledge management; knowledge reuse; learning organisations; project performance; CRITICAL SUCCESS FACTORS; KNOWLEDGE MANAGEMENT; DESIGN CHANGES; COST OVERRUNS; DELAY MITIGATION; MODEL; REWORK; IMPACTS; TEAM; COMMUNICATION;
D O I
10.1080/15623599.2019.1629864
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Schedule delays and cost overruns are common events in construction. The construction industry predominantly suffers from deficient project knowledge management. This paper seeks to develop a conceptual framework to enhance project delivery performances in construction projects adopting project learning approach. The existing patterns, themes and issues correlated with overruns causation and knowledge management in the construction industry are studied to appraise the development of the conceptual framework. It is propagated that if project performance in construction projects is to improve, then experiential learning and personal constructs of project personnel will form an integral part of reusable project knowledge. Continuous project learning ultimately improve competency in project management. Collaborative working environment enriches the quality and quantity of learning in construction settings. Project learning prevents the wastage of time and resources in the reinvention of the same knowledge, minimise rework, inhibit the reoccurrence of past mistakes and repeat project success. The conceptualised project learning framework provides a theoretically corroborated explanation of project performance, underpinned by experiential learning theory and personal construct theory and exploitation of reusable project knowledge.
引用
收藏
页码:436 / 452
页数:17
相关论文
共 151 条
  • [21] [Anonymous], 2003, CIB W78 INT C INF TE
  • [22] [Anonymous], 2011, Handbook of Research on Improving Learning and Motivation through Educational Games: Multidisciplinary Approaches
  • [23] [Anonymous], 2014, DEV LEARNING ORGANIS
  • [24] [Anonymous], INT J PROJECT MANAGE
  • [25] [Anonymous], J EUR IND TRAIN
  • [26] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    [J]. Int. J. Proj. Manage., 2006, 4 (349-357): : 349 - 357
  • [27] Austin S., 2002, International Journal of Project Management, V20, P191, DOI DOI 10.1016/S0263-7863(01)00068-0
  • [28] A framework to integrate design knowledge reuse and requirements management in engineering design
    Baxter, David
    Gao, James
    Case, Keith
    Harding, Jenny
    Young, Bob
    Cochrane, Sean
    Dani, Shilpa
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2008, 24 (04) : 585 - 593
  • [29] Constructing learning: adversarial and collaborative working in the British construction industry
    Bishop, Dan
    Felstead, Alan
    Fuller, Alison
    Jewson, Nick
    Unwin, Lorna
    Kakavelakis, Konstantinos
    [J]. JOURNAL OF EDUCATION AND WORK, 2009, 22 (04) : 243 - 260
  • [30] Brantley WA, 2016, 2016 PROJ MAN S, P34