Enhancing project delivery performances in construction through experiential learning and personal constructs: competency development

被引:13
作者
Yap, Jeffrey Boon Hui [1 ,2 ]
Shavarebi, Kamran [2 ]
机构
[1] Univ Tunku Abdul Rahman, Lee Kong Chian Fac Engn & Sci, Dept Surveying, Kajang, Malaysia
[2] Int Univ Malaya Wales, Fac Sci Technol Engn & Math, Kuala Lumpur, Malaysia
关键词
Project management; knowledge management; knowledge reuse; learning organisations; project performance; CRITICAL SUCCESS FACTORS; KNOWLEDGE MANAGEMENT; DESIGN CHANGES; COST OVERRUNS; DELAY MITIGATION; MODEL; REWORK; IMPACTS; TEAM; COMMUNICATION;
D O I
10.1080/15623599.2019.1629864
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Schedule delays and cost overruns are common events in construction. The construction industry predominantly suffers from deficient project knowledge management. This paper seeks to develop a conceptual framework to enhance project delivery performances in construction projects adopting project learning approach. The existing patterns, themes and issues correlated with overruns causation and knowledge management in the construction industry are studied to appraise the development of the conceptual framework. It is propagated that if project performance in construction projects is to improve, then experiential learning and personal constructs of project personnel will form an integral part of reusable project knowledge. Continuous project learning ultimately improve competency in project management. Collaborative working environment enriches the quality and quantity of learning in construction settings. Project learning prevents the wastage of time and resources in the reinvention of the same knowledge, minimise rework, inhibit the reoccurrence of past mistakes and repeat project success. The conceptualised project learning framework provides a theoretically corroborated explanation of project performance, underpinned by experiential learning theory and personal construct theory and exploitation of reusable project knowledge.
引用
收藏
页码:436 / 452
页数:17
相关论文
共 151 条
  • [1] Delay mitigation in the Malaysian construction industry
    Abdul-Rahman, H
    Berawi, MA
    Berawi, AR
    Mohamed, O
    Othman, M
    Yahya, IA
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) : 125 - 133
  • [2] Abdul-Rahman H., 2011, AM J EC BUSINESS ADM, V3, P430
  • [3] Conceptual delay mitigation model using a project learning approach in practice
    Abdul-Rahman, Hamzah
    Yahya, Imran Ariff
    Berawi, Mohammed Ali
    Wah, Low Wai
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (01) : 15 - 27
  • [4] Effect of knowledge management on growth performance in construction industry
    Abu Bakar, Abu Hassan
    Yusof, Mohamad Nizam
    Tufail, Muhammad Asim
    Virgiyanti, Wiwied
    [J]. MANAGEMENT DECISION, 2016, 54 (03) : 735 - 749
  • [5] Modeling for litigation: Mixing qualitative and quantitative approaches
    Ackermann, F
    Eden, C
    Williams, T
    [J]. INTERFACES, 1997, 27 (02) : 48 - 65
  • [6] Researching complex projects: Using causal mapping to take a systems perspective
    Ackermann, Fran
    Alexander, James
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (06) : 891 - 901
  • [7] Tacit and explicit knowledge in construction management
    Addis, Mark
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2016, 34 (7-8) : 439 - 445
  • [8] Complex project management as complex problem solving: A distributed knowledge management perspective
    Ahern, Terence
    Leavy, Brian
    Byrne, P. J.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (08) : 1371 - 1381
  • [9] Al-Ghassani A., 2004, PROJ MANAG J, V35, P46, DOI [10.1177/875697280403500106, DOI 10.1177/875697280403500106, DOI 10.1177/875697280403500105]
  • [10] Knowledge Utilization Process in Highway Construction Projects
    Alashwal, Ali Mohammed
    Abdul-Rahman, Hamzah
    Radzi, Juwita
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (04)