Software profit model under imperfect debugging and optimal software release policy

被引:0
|
作者
Lee, CH
Nam, KH
Park, DH [1 ]
机构
[1] Konyang Univ, Fac Div Informat Technol, Nonsan, South Korea
[2] Kyonggi Univ, Fac Div Econ, Suwon, South Korea
[3] Hallym Univ, Fac Dept Stat, Chunchon, South Korea
关键词
imperfect debugging; optimal software release policy; profit model; random life cycle; penalty cost;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper considers a software reliability model which allows for two types, of imperfect debuggings at each failure of tire software system, For uric type of imperfect debugging, a fault that causes the failure is imperfectly debugged without altering the fault contents of the software, system. For the other type of imperfect debugging. the fault is not only imperfectly debugged. but also a new fault is generated and introduced into the system. The probability of perfect debugging is assumed to be an increasing function of the number of debuggings performed prior to the current failure of the system. Based on the software reliability model presented, we consider three profit models to determine the optimal software release times which maximize the expected software profit, These models consider: (1) constant life cycle. (2) random life cycle, (3) random life cycle and penalty cost which is imposed when the software is delivered lam The optimal release times are shown to be finite and unique. Numerical examples are provided for illustrative purposes.
引用
收藏
页码:833 / 838
页数:6
相关论文
共 50 条
  • [1] Effect of change point and imperfect debugging in software reliability and its optimal release policy
    Chatterjee, Subhashis
    Nigam, Shobhit
    Singh, Jeetendra Bahadur
    Upadhyaya, Lakshmi Narayan
    MATHEMATICAL AND COMPUTER MODELLING OF DYNAMICAL SYSTEMS, 2012, 18 (05) : 539 - 551
  • [2] A NHPP based software reliability model and optimal release policy with logistic-exponential test coverage under imperfect debugging
    Chatterjee S.
    Singh J.B.
    Chatterjee, S. (chaterjee_subhashis@rediffmail.com), 1600, Springer (05): : 399 - 406
  • [3] A Discrete SRGM for Multi-Release Software System with Imperfect Debugging and Related Optimal Release Policy
    Aggarwal, Anu G.
    Nijhawan, Nidhi
    Kapur, P. K.
    2015 1ST INTERNATIONAL CONFERENCE ON FUTURISTIC TRENDS ON COMPUTATIONAL ANALYSIS AND KNOWLEDGE MANAGEMENT (ABLAZE), 2015, : 186 - 192
  • [4] Evaluation of software availability for the imperfect software debugging model
    Lee, CH
    Lee, SM
    Park, DH
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2005, 36 (11) : 671 - 678
  • [5] A Unified Approach for Successive Release of a Software Under Two Types of Imperfect Debugging
    Singh, Ompal
    Kapur, P. K.
    Shrivastava, A. K.
    Das, Lipsa
    2014 3RD INTERNATIONAL CONFERENCE ON RELIABILITY, INFOCOM TECHNOLOGIES AND OPTIMIZATION (ICRITO) (TRENDS AND FUTURE DIRECTIONS), 2014,
  • [6] A software reliability growth model for imperfect debugging
    Huang, Yeu-Shiang
    Chiu, Kuei-Chen
    Chen, Wan-Ming
    JOURNAL OF SYSTEMS AND SOFTWARE, 2022, 188
  • [7] Software warranty cost optimization under imperfect debugging
    Verma, Vibha
    Anand, Sameer
    Aggarwal, Anu Gupta
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2020, 37 (9-10) : 1233 - 1257
  • [8] Optimal price and testing time of a software under warranty and two types of imperfect debugging
    P. K. Kapur
    Ompal Singh
    A. K. Shrivastava
    International Journal of System Assurance Engineering and Management, 2014, 5 (2) : 120 - 126
  • [9] Optimal price and testing time of a software under warranty and two types of imperfect debugging
    Kapur, P. K.
    Singh, Ompal
    Shrivastava, A. K.
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2014, 5 (02) : 120 - 126
  • [10] A software reliability growth model for component-based software incorporating debugging delay and imperfect debugging
    张策
    Cui Gang
    Meng Fanchao
    Liu Hongwei
    Bian Yali
    High Technology Letters, 2015, 21 (01) : 54 - 62