A parallel-machine scheduling problem with periodic maintenance under uncertainty

被引:20
作者
Shen, Jiayu [1 ]
Zhu, Yuanguo [2 ]
机构
[1] Nanjing Inst Ind Technol, Dept Publ Basic Courses, Nanjing 210023, Jiangsu, Peoples R China
[2] Nanjing Univ Sci & Technol, Sch Sci, Nanjing 210094, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Parallel machine; Maintenance; Makespan; Worst-case; LPT; PREVENTIVE MAINTENANCE; MAKESPAN MINIMIZATION; SINGLE-MACHINE; LPT ALGORITHM; FLOW-SHOP; JOBS; SUBJECT;
D O I
10.1007/s12652-018-1032-8
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A parallel-machine scheduling problem with preventive maintenance is studied in the paper. Because of the existence of indeterminacy phenomenon, the processing and maintenance time are assume to be uncertain variables. To address these uncertain parameters, two pessimistic value mathematical programming models are developed and the equivalence is proved. The worst-case bound of longest processing time (LPT) rule for the problem under an uncertain environment is obtained. To solve this problem effectively, an improved LPT rule is proposed according to the result of the theoretical analysis. Finally, numerical experiments show that the improved LPT outperforms the LPT in improving the quality of the optimal value and has a less relative error than that of the LPT.
引用
收藏
页码:3171 / 3179
页数:9
相关论文
共 39 条
[1]   Robust scheduling of parallel machines considering total flow time [J].
Alimoradi, S. ;
Hematian, M. ;
Moslehi, G. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 93 :152-161
[2]   Scheduling two-stage hybrid flow shop with availability constraints [J].
Allaoui, H ;
Artiba, A .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (05) :1399-1419
[3]  
[Anonymous], 2015, J UNCERTAIN ANAL APP, DOI DOI 10.1186/S40467-014-0025-1
[4]  
[Anonymous], 2010, FIXED POINT THEORY A, DOI DOI 10.1155/2010/283827
[5]  
[Anonymous], 2009, J UNCERTAIN SYST
[6]   Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance [J].
Benmansour, Rachid ;
Allaoui, Hamid ;
Artiba, Abdelhakim ;
Hanafi, Said .
COMPUTERS & OPERATIONS RESEARCH, 2014, 47 :106-113
[7]   Minimizing number of tardy jobs on a single machine subject to periodic maintenance [J].
Chen, Wen-Jinn .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2009, 37 (03) :591-599
[8]  
Chen X., 2012, J UNCERTAIN SYSTEMS, V6, P256
[9]  
Deng LB, 2016, J ADV COMPUT INTELL, V20, P189
[10]   Makespan minimization on a two-machine flowshop with an availability constraint on the first machine [J].
Hnaien, Faicel ;
Yalaoui, Farouk ;
Mhadhbi, Ahmed .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 164 :95-104