Soft ground tunneling in Chicago clay

被引:0
作者
Nasri, V. [1 ]
Ayoubian, A. [1 ]
机构
[1] STV Inc, New York, NY 10003 USA
来源
NORTH AMERICAN TUNNELING 2006 | 2006年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Block 37 Station Tunnel Connection project will include construction of two short tunnels to connect the existing subway tunnels (Red and Blue lines) in the northern loop area of downtown Chicago through a new station. The Southeast Tunnel will connect the Red Line to the new station below the intersection of State and Washington Streets and the Northwest Tunnel will connect the Blue Line to the new station below the intersection of Dearborn and Randolph Streets. The connection tunnels are located in a very dense urban area of downtown Chicago and under several important historical buildings. Both tunnels are curved at the intersections and located at a depth of about 25 ft below ground surface in saturated soft clay with an average undrained shear strength of approximately 0.50 ksf. The design calls for minimizing surface disruption and ground displacement while maintaining normal operation of the existing subways during the construction of the connections tunnels.
引用
收藏
页码:313 / +
页数:2
相关论文
共 7 条
[1]  
Brinkgreve R.B. J., 2002, PLAXIS 2D VERSION 8
[2]  
FINNO RJ, 2005, HARDENING SOIL PARAM
[3]  
LUNARDI P, 2000, T T INT SPECIAL MAY
[4]  
*PATR ENG INC, 2005, GEOT BAS REP 100 SUB
[5]  
PECK RB, 1954, ENG PROPERTIES CHICA, V47
[6]  
Schanz T, 1999, BEYOND 2000 IN COMPUTATIONAL GEOTECHNICS, P281
[7]  
Terzaghi K., 1942, J Boston Soc Civ Eng, V29, P163