Stress relaxation testing of pre-compression ring mock-up for the ITER magnet system

被引:7
作者
Rossi, R. [1 ]
Annino, C. [1 ]
Baker, W. [3 ]
Bettinali, L. [1 ]
Knaster, J. [4 ]
Lo Bue, A. [1 ]
Mazzone, G. [4 ]
Nardi, C. [1 ]
Pizzuto, A. [1 ]
Semeraro, L. [2 ]
机构
[1] EURATOM, ENEA Fus, CR Frascati, I-00044 Frascati, Italy
[2] Fus Energy, Barcelona 08019, Spain
[3] EFDA CSU, D-85748 Garching, Germany
[4] ITER Cadarache, F-13108 St Paul Les Durance, France
关键词
Composite; Epoxy; Fibreglass; ITER; Pre-compression rings;
D O I
10.1016/j.fusengdes.2008.12.024
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The ITER pre-compression ring system is based on two sets of 3 rings made in fibreglass-epoxy composite and is located on top and bottom of the inner straight leg region. These rings will provide a radial force of about 70 MN/coil (35 MN at the top and 35 MN at the bottom) under cryogenic conditions, pulling the TF coils into contact, reducing the gap between the poloidal shear keys and their keyways during operation and also reducing the toroidal tension in the four Outer intercoil structures bands. The paper describes the stress relaxation test performed in ENEA Frascati laboratories on a reduced scale glass fibre-epoxy composite ring. The ring was manufactured with a diameter of 1 m (1/5 of the real scale one) by winding S2 glass fibres then impregnated with epoxy. The volumetric glass content was of 69% and no significant presence of defects was verified by an X-ray survey. The test has been carried out following as close as possible the ASTM standard E 328-86. The ring has been inserted into a dedicated hydraulic testing machine consisting of 18 radial pulling actuators and then loaded up to a ring membrane hoop stress of 800 MPa. The deformation has been maintained constant during the test by inserting a solid steel disk in the machine centre restraining the machine radial motion. Average hoop stress has been daily monitored measuring the force required to lift the ring just free of the constraints during the test period. The ring performed 125 testing days showing no significant stress relaxation and a small reduction of the ring stiffness that appeared mainly in the first days of the test. (C) 2009 Published by Elsevier B.V.
引用
收藏
页码:1649 / 1652
页数:4
相关论文
共 6 条
[1]  
*ASTM, 1996, E32886 ASTM
[2]   The pre-compression system of the toroidal field coils in ITER [J].
Knaster, J. ;
Feffari, M. ;
Jong, C. ;
Vollmann, T. .
FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) :1413-1422
[3]  
*LUBR, AAP11606
[4]  
M AD, 1939, COMPOSITE MATERIALS, V13, P3039
[5]   Fibreglass unidirectional composite to be used for ITER pre-compression rings [J].
Nardi, C ;
Bettinali, L ;
Pizzuto, A .
FUSION ENGINEERING AND DESIGN, 2005, 75-79 :249-252
[6]  
758AB675