Application of System Dynamics in Environmental Risk Management of Project Management for External Stakeholders

被引:13
|
作者
Yang, Chao-Chung [1 ]
Yeh, Chao-Hsien [1 ]
机构
[1] Feng Chia Univ, Dept Water Resources Engn & Conservat, Taichung 40724, Taiwan
关键词
System dynamics; Environmental risk management; External stakeholders; System archetypes; Project management;
D O I
10.1007/s11213-013-9283-y
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Environmental risks arise from external forces that can easily render a project out of management control. Project managers who want to avoid external-force effects must understand the problems between the project and possible external stakeholders. Most traditional risk-management techniques are used to create a list of identified risks based on the experiences and opinions of experts or kernel members such that the relationship between risks or the feedback characteristics are impossible to discover. System dynamics (SD) can use dynamics and feedback to assist decision makers in understanding the structure and characteristics of a complex system. Therefore, this study applies SD to propose a 7-step process for solving an environmental risk management problem systematically, and efficiently. This process enables project managers to reduce the negative effects of project threats. Finally, this study conducts a simplified case study of an industrial area development project to present the viability of the proposed methodology.
引用
收藏
页码:211 / 225
页数:15
相关论文
共 50 条
  • [21] Application of a methodology for risk management on tunnel project
    Gaillard, C.
    Humbert, E.
    Robert, A.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 110 - 117
  • [22] Managing stakeholders for project management success: an emergent model of stakeholders
    Assudani, Rashmi
    Kloppenborg, Timothy J.
    JOURNAL OF GENERAL MANAGEMENT, 2010, 35 (03) : 67 - 80
  • [23] The Application of Unascertained Mathematics in Project Risk Management
    Li, Wanqing
    Yang, Zixue
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 416 - 419
  • [24] Practical Application of the Management Priority of Project Risk
    Chen, Qi
    Li, Liangbao
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 803 - 806
  • [25] System dynamics modeling for SOA project management
    J J Jeng
    Lianjun An
    IEEE INTERNATIONAL CONFERENCE ON SERVICE-ORIENTED COMPUTING AND APPLICATIONS, PROCEEDINGS, 2007, : 286 - +
  • [26] System dynamics methods in complex project management
    Cooper, KG
    MANAGING AND MODELLING COMPLEX PROJECTS, 1997, 17 : 89 - 108
  • [27] The application of project management for management problem solving of river environmental improvement projects
    Yang C.-C.
    Chang L.-C.
    Chou Y.-C.
    Journal of Taiwan Agricultural Engineering, 2018, 64 (04): : 44 - 57
  • [28] Risk management is project management!
    Lister, T
    EIGHTEENTH ANNUAL PACIFIC NORTHWEST SOFTWARE QUALITY CONFERENCE, PROCEEDINGS, 2000, : 7 - 27
  • [29] Research on the Conflict Management of Stakeholders in a Construction Project
    Li, Yingjie
    Hao, Shengyue
    Ren, Xu
    ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 733 - 740
  • [30] SATISFYING STAKEHOLDERS FOR SUCCESSFUL PROJECT-MANAGEMENT
    MALLAK, LA
    PATZAK, GR
    KURSTEDT, HA
    COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 21 (1-4) : 429 - 433