Heuristic optimization for dual-resource constrained job shop scheduling

被引:4
|
作者
Ren Huiyuan [1 ]
Jiang Lili [1 ]
Xi Xiaoying [1 ]
Li Muzhi [1 ]
机构
[1] Guangdong Univ Technol, Fac Electromech Engn, Guangzhou, Guangdong, Peoples R China
来源
2009 INTERNATIONAL ASIA CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION, AND ROBOTICS, PROCEEDINGS | 2009年
关键词
dual-resource constrained; job shop scheduling; heuristic active algorithm;
D O I
10.1109/CAR.2009.113
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the study of job shop scheduling problem in mass injection molding processing enterprises, the practical job shop scheduling environment cannot be mirrored in the traditional study only considering machine resources. A dual-resource (machines and moulds) constrained job shop scheduling problem model was established in this paper, according to the actual factors of mass injection molding processing job shop scheduling. A heuristic active algorithm combined with priority rules is employed to give the solution. Finally, an example is made to illustrate the algorithm, whose schedule result is shown with a Gantt chart.
引用
收藏
页码:485 / 488
页数:4
相关论文
共 50 条
  • [21] Dual Resource Constrained Flexible Job Shop Scheduling Based on Improved Quantum Genetic Algorithm
    Zhang, Shoujing
    Du, Haotian
    Borucki, Sebastian
    Jin, Shoufeng
    Hou, Tiantian
    Li, Zhixiong
    MACHINES, 2021, 9 (06)
  • [22] Research on Double-Objective Optimal Scheduling Algorithm for Dual Resource Constrained Job Shop
    Li Jingyao
    Sun Shudong
    Huang Yuan
    Niu Ganggang
    ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, PT I, 2010, 6319 : 222 - +
  • [23] Optimization for Multi-resources-constrained Job Shop Scheduling based on Three-level Heuristic Algorithm
    Xi Xiaoying
    Jiang Lili
    Zhang Qiang
    2009 INTERNATIONAL ASIA CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION, AND ROBOTICS, PROCEEDINGS, 2009, : 296 - 300
  • [24] A new heuristic algorithm for job shop scheduling
    Pan, YC
    Feng, YC
    ICIM' 2004: PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2004, : 191 - 196
  • [25] MRP in a job shop environment using a resource constrained project scheduling model
    Rom, WO
    Tukel, OI
    Muscatello, JR
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2002, 30 (04): : 275 - 286
  • [26] The hybrid heuristic genetic algorithm for job shop scheduling
    Zhou, H
    Feng, YC
    Han, LM
    COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 40 (03) : 191 - 200
  • [27] A novel heuristic approach for job shop scheduling problem
    Wang, Yong-Ming
    Xiao, Nan-Feng
    Yin, Hong-Li
    Hu, En-Liang
    FRONTIERS IN ALGORITHMICS, PROCEEDINGS, 2007, 4613 : 252 - +
  • [28] A heuristic for job shop scheduling to minimize total weighted tardiness
    Asano, M
    Ohta, H
    COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (2-4) : 137 - 147
  • [29] A Simple Optimised Search Heuristic for the Job Shop Scheduling Problem
    Fernandes, Susana
    Lourenco, Helena R.
    RECENT ADVANCES IN EVOLUTIONARY COMPUTATION FOR COMBINATORIAL OPTIMIZATION, 2008, 153 : 203 - +
  • [30] A Constructive Heuristic for Solving the Job-Shop Scheduling Problem
    Mellado, R.
    Cubillos, C.
    Cabrera, D.
    IEEE LATIN AMERICA TRANSACTIONS, 2016, 14 (06) : 2758 - 2763