Heuristic optimization for dual-resource constrained job shop scheduling

被引:4
|
作者
Ren Huiyuan [1 ]
Jiang Lili [1 ]
Xi Xiaoying [1 ]
Li Muzhi [1 ]
机构
[1] Guangdong Univ Technol, Fac Electromech Engn, Guangzhou, Guangdong, Peoples R China
来源
2009 INTERNATIONAL ASIA CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION, AND ROBOTICS, PROCEEDINGS | 2009年
关键词
dual-resource constrained; job shop scheduling; heuristic active algorithm;
D O I
10.1109/CAR.2009.113
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the study of job shop scheduling problem in mass injection molding processing enterprises, the practical job shop scheduling environment cannot be mirrored in the traditional study only considering machine resources. A dual-resource (machines and moulds) constrained job shop scheduling problem model was established in this paper, according to the actual factors of mass injection molding processing job shop scheduling. A heuristic active algorithm combined with priority rules is employed to give the solution. Finally, an example is made to illustrate the algorithm, whose schedule result is shown with a Gantt chart.
引用
收藏
页码:485 / 488
页数:4
相关论文
共 50 条
  • [1] Research on Scheduling of Dual-Resource Constrained Job Shop
    Liu Xiaoxia
    Cai Gangyi
    Cui Jingwei
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2009, : 1742 - 1748
  • [2] Dynamic Scheduling of Dual-Resource Constrained Blocking Job Shop
    Tao, Ze
    Liu, Xiaoxia
    INTELLIGENT ROBOTICS AND APPLICATIONS, ICIRA 2019, PART VI, 2019, 11745 : 447 - 456
  • [3] OPTIMIZATION ALGORITHM SIMULATION FOR DUAL-RESOURCE CONSTRAINED JOB-SHOP SCHEDULING
    Zhong, Q.
    Yang, H.
    Tang, T.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2018, 17 (01) : 147 - 158
  • [4] Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem
    Yazdani, M.
    Zandieh, M.
    Tavakkoli-Moghaddam, R.
    Jolai, F.
    SCIENTIA IRANICA, 2015, 22 (03) : 1242 - 1257
  • [5] A Hybrid Genetic Algorithm for Dual-Resource Constrained Job Shop Scheduling Problem
    Li, Jingyao
    Huang, Yuan
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 463 - 475
  • [6] A branch population genetic algorithm for dual-resource constrained job shop scheduling problem
    Li, Jingyao
    Huang, Yuan
    Niu, Xinwei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 102 : 113 - 131
  • [7] Research on Bi-objective Scheduling of Dual-Resource Constrained Flexible Job Shop
    Liu, Xiaoxia
    Liu, Chunbo
    Tao, Ze
    MECHATRONICS AND INTELLIGENT MATERIALS, PTS 1 AND 2, 2011, 211-212 : 1091 - +
  • [8] Based on Petri Nets and Hybrid Genetic-Tabu Search Approach to Scheduling Optimization for Dual-Resource Constrained Job Shop
    Liang Di
    Liu Si
    Tao Ze
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ELECTRONIC & MECHANICAL ENGINEERING AND INFORMATION TECHNOLOGY (EMEIT-2012), 2012, 23
  • [9] A two-stage assignment strategy for the robust scheduling of dual-resource constrained stochastic job shop scheduling problems
    Xiao, Shichang
    Wu, Zigao
    Yu, Shaohua
    IFAC PAPERSONLINE, 2019, 52 (13): : 421 - 426
  • [10] Algorithm for dual resource constrained job shop scheduling
    Li J.
    Sun S.
    Huang Y.
    Wang N.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (22): : 175 - 181