Study on Project Risk Management Information System Based on Progress Schedule

被引:0
作者
Lai Yifei [1 ]
Zhang Qianhua [1 ]
Jia Junping [1 ]
机构
[1] Wuhan Univ, Sch Econ & Management, Wuhan 430072, Hubei, Peoples R China
来源
2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31 | 2008年
关键词
Project Progress Schedule; Project Risk Management; MIS; Multilayered Distributed Structure;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
From how to design management information system to effectively avoid the project risk then to guarantee the smooth implementation of the progress schedule, this paper analyzes the process of designing the management information system based on project progress schedule, emphatically discusses the analysis of data flow diagram and the main modules design. Based on the multilayered distributed application structure, this system realizes the effective integration of the project progress schedule management, the risk process management, the communication management, the consultation management, so as to guarantee the smooth implementation of the progress schedule.
引用
收藏
页码:10502 / 10506
页数:5
相关论文
共 14 条
[1]  
CAO CX, 2005, SCI MANAGEMENT RES, P47
[2]  
CHAPMAN C.B., 2003, PROJECT RISK MANAGEM
[3]  
CLIENTS JGJ, 2001, SUCCESSFUL PROJECT M
[4]  
DELOCH J, 1998, ENTERPRISE WIDE RISK
[5]  
GUO SY, 2007, J WATER RESOURCES AR, P18
[6]  
HONG R, 2005, ENG PROJECT MANAGEME
[7]  
KERZNER H, 2006, SYSTEM METHOD PROJEC
[8]  
LAI YF, 2006, ENG PROJECT MANAGEME
[9]  
LAI YF, 2007, PROJECT PROGRAMME SC
[10]  
LIANG JF, 1996, DESING IMPLEMENTATIO, P79