共 10 条
- [1] Cai W., 2007, THESIS TONGJI U
- [3] INVESTMENT UNDER UNCERTAINTY - DIXIT,AK, PINDYCK,RS [J]. JOURNAL OF FINANCE, 1994, 49 (05) : 1924 - 1928
- [4] [高咏玲 GAO Yongling], 2008, [铁道学报, Journal of the China Railway Society], V30, P13
- [6] [李文兴 Li Wenxing], 2012, [交通运输系统工程与信息, Journal of Transporation Systems Engineering & Information Technology], V12, P9
- [7] Peskir G., 2006, LEC MATH, DOI 10.1007/978-3-7643-7390-0
- [9] Risk concession model for build/operate/transfer contract projects [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (02): : 211 - 220
- [10] Net Asset Value-Based Concession Duration Model for BOT Contracts [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (02): : 304 - 308