Lot size optimization in manufacturing systems: The surrogate method

被引:19
作者
Adacher, Ludovica [1 ]
Cassandras, Christos G. [2 ]
机构
[1] Roma Tre Univ, Dept Engn, Rome, Italy
[2] Div Syst Engn, Brookline, MA USA
关键词
Lot size problem; Surrogate method; Stochastic comparison; SIZING PROBLEM; TIMES; HEURISTICS;
D O I
10.1016/j.ijpe.2013.07.026
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we extend a stochastic discrete optimization approach so as to tackle the lot-sizing problem in manufacturing systems. In practice, with the surrogate methodology, the lot sizes are continuously adjusted on-line by the gradient-based approach. The lot sizing determines the number of parts batched together for production. We utilize the queueing approach that evidences the existence of a convex relationship between batch size and waiting time (including processing). Large lot sizes will cause long lead times (the batching effect), as the lot size gets smaller the lead time will decrease but once a minimal lot size is reached a further reduction of the lot size will cause high traffic intensities resulting in longer lead times (the saturation effect). The congestion phenomenon is due to the increased number of setups (and thus total setup time). In this paper, we consider the Surrogate method and the Stochastic comparison algorithm. According to our findings, the Surrogate method finds the optimal solution of the original discrete problem and exhibits a very fast convergence. Some numerical results are reported. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:418 / 426
页数:9
相关论文
共 33 条
[1]   MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs [J].
Absi, Nabil ;
Kedad-Sidhoum, Safia .
RAIRO-OPERATIONS RESEARCH, 2007, 41 (02) :171-192
[2]   A global optimization approach to solve the traffic signal synchronization problem [J].
Adacher, L. .
PROCEEDINGS OF EWGT 2012 - 15TH MEETING OF THE EURO WORKING GROUP ON TRANSPORTATION, 2012, 54 :1270-1277
[3]  
Adacher L., 2010, 2010 13th International IEEE Conference on Intelligent Transportation Systems (ITSC 2010), P60, DOI 10.1109/ITSC.2010.5624975
[4]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[5]   A heuristic approach for big bucket multi-level production planning problems [J].
Akartunali, Kerem ;
Miller, Andrew J. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (02) :396-411
[6]   bc-prod:: A specialized branch-and-cut system for lot-sizing problems [J].
Belvaux, G ;
Wolsey, LA .
MANAGEMENT SCIENCE, 2000, 46 (05) :724-738
[7]   Single item lot sizing problems [J].
Brahimi, N ;
Dauzere-Peres, S ;
Najid, NM ;
Nordli, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (01) :1-16
[8]  
Cassandras CG, 2000, P AMER CONTR CONF, P3279, DOI 10.1109/ACC.2000.879171
[9]  
Enns ST, 2004, PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P1073
[10]   Progressive interval heuristics for multi-item capacitated lot-sizing problems [J].
Federgruen, Awi ;
Meissner, Joern ;
Tzur, Michal .
OPERATIONS RESEARCH, 2007, 55 (03) :490-502