On optimal payment time for a retailer under permitted delay of payment by the wholesaler

被引:32
作者
Song, Xiping [1 ]
Cai, Xiaoqiang [1 ]
机构
[1] Chinese Univ Hong Kong, Dept Syst Engn & Engn Management, Shatin, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
perishable products; wholesaler-retailer supply chains; optimal payment time; optimal order quantity; PERMISSIBLE DELAY; ORDER QUANTITY; POLICIES;
D O I
10.1016/j.ijpe.2005.07.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Jamal et al. [2000. Optimal payment time for a retailer under permitted delay of payment by the wholesaler. International Journal of Production Economics 66, 59-66] study a wholesaler-retailer supply chain where the retailer is given a permissible credit period to pay back the dues without paying any interest to the wholesaler. The problem is modeled as a cost minimization problem with two decision variables: the payment time P of the retailer and the length of the inventory cycle T. While the model represents, in general, an interesting problem, we show in this note that there are a number of nontrivial flaws contained in the development of their model and therefore the solution they derived is not correct. We give the correct model and derive the corresponding optimal solution. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:246 / 251
页数:6
相关论文
共 8 条
[1]  
AGGARWAL SP, 1995, J OPER RES SOC, V46, P658, DOI 10.1057/jors.1995.90
[2]   Retailer's pricing, credit and inventory policies for deteriorating items in response to temporary price/credit incentives [J].
Arcelus, FJ ;
Shah, NH ;
Srinivasan, G .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 81-2 :153-162
[3]   The optimal inventory policies under permissible delay in payments depending on the ordering quantity [J].
Chung, KJ ;
Goyal, SK ;
Huang, YF .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 95 (02) :203-213
[5]   Retailer's pricing and lot sizing policy for exponentially deteriorating products under the condition of permissible delay in payments [J].
Hwang, H ;
Shinn, SW .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (06) :539-547
[6]   Optimal payment time for a retailer under permitted delay of payment by the wholesaler [J].
Jamal, AMM ;
Sarker, BR ;
Wang, SJ .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 66 (01) :59-66
[7]  
KIM JS, 1997, PRODUCTION PLANNING, V6, P45
[8]   EFFECTS OF INFLATION AND THE TIME VALUE OF MONEY ON ORDER QUANTITY AND ALLOWABLE SHORTAGE [J].
SARKER, BR ;
PAN, HX .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 34 (01) :65-72