Statistical analysis of the Nb3Sn strand production for the ITER toroidal field coils

被引:10
作者
Vostner, A. [1 ]
Jewell, M. [2 ]
Pong, I. [3 ]
Sullivan, N. [2 ]
Devred, A. [1 ]
Bessette, D. [1 ]
Bevillard, G. [1 ]
Mitchell, N. [1 ]
Romano, G. [1 ]
Zhou, C. [1 ]
机构
[1] ITER Org, CS 90 046, Route Vinon Sur Verdon, F-13067 St Paul Les Durance, France
[2] Univ Wisconsin, Mat Sci Program, Eau Claire, WI 54702 USA
[3] Lawrence Berkeley Natl Lab, Accelerator Technol & Appl Phys Div, Berkeley, CA 94720 USA
关键词
ITER; Nb3Sn strand; critical current; strand performance; production;
D O I
10.1088/1361-6668/aa5954
中图分类号
O59 [应用物理学];
学科分类号
摘要
The ITER toroidal field (TF) strand procurement initiated the largest Nb3Sn superconducting strand production hitherto. The industrial-scale production started in Japan in 2008 and finished in summer 2015. Six ITER partners (so-called Domestic Agencies, or DAs) are in charge of the procurement and involved eight different strand suppliers all over the world, of which four are using the bronze route (BR) process and four the internal-tin (IT) process. In total more than 500 tons have been produced including excess material covering losses during the conductor manufacturing process, in particular the cabling. The procurement is based on a functional specification where the main strand requirements like critical current, hysteresis losses, Cu ratio and residual resistance ratio are specified but not the strand production process or layout. This paper presents the analysis on the data acquired during the quality control (QC) process that was carried out to ensure the same conductor performance requirements are met by the different strand suppliers regardless of strand design. The strand QC is based on 100% billet testing and on applying statistical process control (SPC) limits. Throughout the production, samples adjacent to the strand pieces tested by the suppliers are cross-checked (`verified') by their respective DAs reference labs. The level of verification was lowered from 100% at the beginning of the procurement progressively to approximately 25% during the final phase of production. Based on the complete dataset of the TF strand production, an analysis of the SPC limits of the critical strand parameters is made and the related process capability indices are calculated. In view of the large-scale production and costs, key manufacturing parameters such as billet yield, number of breakages and piece-length distribution are also discussed. The results are compared among all the strand suppliers, focusing on the difference between BR and IT processes. Following the completion of the largest Nb3Sn strand production, our experience gained from monitoring the execution of the QC activities and from auditing the results from the measurements is summarised for future superconducting strand material procurement activities.
引用
收藏
页数:14
相关论文
共 26 条
[1]   The RRR Parameter of the ITER Type Bronze-Route Cr-Coated Nb3Sn Strands After Different Heat Treatments [J].
Abdyukhanov, I. M. ;
Vorobieva, A. E. ;
Dergunova, E. A. ;
Polikarpova, M. V. ;
Mareev, K. A. ;
Traktirnikova, N. V. ;
Novosilova, D. S. ;
Pantsyrny, V. I. ;
Lukyanov, P. A. .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2012, 22 (03)
[2]   Results of Investigations of 500 kg Nb3Sn Bronze Strand Produced in Russian Federation for ITER Project [J].
Abdyukhanov, I. M. ;
Shikov, A. K. ;
Vorobyeva, A. E. ;
Pantsyrnyy, V. I. ;
Beliakov, N. A. ;
Dergunova, E. A. ;
Mareev, K. A. ;
Nasibulin, M. N. ;
Zernov, S. M. ;
Abramushin, K. M. ;
Anishuk, D. S. .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2011, 21 (03) :2567-2570
[3]   Degradation of the Cu Residual Resistivity Ratio in Cr-Plated Composite Nb3Sn Wires [J].
Alknes, P. ;
Bordini, B. ;
Bartova, B. ;
Izquierdo, G. A. ;
Cantoni, M. ;
Devred, A. ;
Vostner, A. ;
Ballarino, A. ;
Bottura, L. .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2015, 25 (03)
[4]  
Boutboul T., 2016, IEEE T APPL SUPERCON, V26
[5]   Results of the TF conductor performance qualification samples for the ITER project [J].
Breschi, M. ;
Devred, A. ;
Casali, M. ;
Bessette, D. ;
Jewell, M. C. ;
Mitchell, N. ;
Pong, I. ;
Vostner, A. ;
Bruzzone, P. ;
Stepanov, B. ;
Boutboul, T. ;
Martovetsky, N. ;
Kim, K. ;
Takahashi, Y. ;
Tronza, V. ;
Yu, Wu .
SUPERCONDUCTOR SCIENCE & TECHNOLOGY, 2012, 25 (09)
[6]   Upgrade of operating range for SULTAN test facility [J].
Bruzzone, P ;
Anghel, A ;
Fuchs, A ;
Pasztor, G ;
Stepanov, B ;
Vogel, M ;
Vecsey, G .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2002, 12 (01) :520-523
[7]   Costs of high-field superconducting strands for particle accelerator magnets [J].
Cooley, LD ;
Ghosh, AK ;
Scanlan, RM .
SUPERCONDUCTOR SCIENCE & TECHNOLOGY, 2005, 18 (04) :R51-R65
[8]   Challenges and status of ITER conductor production [J].
Devred, A. ;
Backbier, I. ;
Bessette, D. ;
Bevillard, G. ;
Gardner, M. ;
Jong, C. ;
Lillaz, F. ;
Mitchell, N. ;
Romano, G. ;
Vostner, A. .
SUPERCONDUCTOR SCIENCE & TECHNOLOGY, 2014, 27 (04)
[9]   Status of ITER Conductor Development and Production [J].
Devred, Arnaud ;
Backbier, Ina ;
Bessette, Denis ;
Bevillard, Gregory ;
Gardner, Mark ;
Jewell, Mathew ;
Mitchell, Neil ;
Pong, Ian ;
Vostner, Alexander .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2012, 22 (03)
[10]   Optimizing Nb3Sn Conductors for High Field Applications [J].
Field, Michael B. ;
Zhang, Youzhu ;
Miao, Hanping ;
Gerace, Michael ;
Parrell, Jeffery A. .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2014, 24 (03)