共 26 条
Simultaneous placement of control and protective devices in the presence of emergency demand response programs in smart grid
被引:14
|作者:
Heydari, Shoeib
[1
]
Mohammadi-Hosseininejad, Seyed Mohsen
[1
]
Mirsaeedi, Hamed
[1
]
Fereidunian, Alireza
[2
]
Lesani, Hamid
[1
]
机构:
[1] Univ Tehran, Dept Elect & Comp Engn, Tehran, Iran
[2] KNTU, Dept Elect Engn, Tehran, Iran
来源:
INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS
|
2018年
/
28卷
/
05期
关键词:
demand response (DR);
distribution automation (DA);
emergency demand response program (EDRP);
FLISR;
incentive;
penalty;
reliability;
self-healing;
smart grid (SG);
DISTRIBUTION-SYSTEMS;
D O I:
10.1002/etep.2537
中图分类号:
TM [电工技术];
TN [电子技术、通信技术];
学科分类号:
0808 ;
0809 ;
摘要:
Utilities confront challenges to optimally plan and develop the distribution grids both for reducing their imposed costs and for satisfying the customers' electricity needs. In this paper, optimal allocation of automatic and manual sectionalizing switches as well as protective devices is performed in presence of load flexibilities. Control devices could improve the duration-based reliability indices, while protective devices could improve both duration-based and frequency-based reliability indices. In this paper, optimal incentives and penalties in the emergency demand response programs (EDRP) are determined based upon the customers' behaviors. The resulting optimization problem is then solved in 2 different scenarios: without load flexibility and incorporating EDRP. Finally, a standard reliability test system (RBTS4) is used to delineate the effectiveness of the proposed method. Furthermore, a sensitivity analysis is conducted to analyze the probability of customers' contribution in EDRP based upon the predetermined contracts.
引用
收藏
页数:14
相关论文