Concurrent realisation and quality assurance of products in the automotive industry

被引:4
作者
Kusar, Janez [1 ]
Rihar, Lidija [1 ]
Duhovnik, Jozef [1 ]
Starbek, Marko [1 ]
机构
[1] Univ Ljubljana, Fac Mech Engn, SI-1000 Ljubljana, Slovenia
来源
CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS | 2014年 / 22卷 / 02期
关键词
Concurrent product realisation; quality management; loops and teams; Gantt charts; quality standards; PERFORMANCE;
D O I
10.1177/1063293X13520315
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The aim of the concurrent product realisation and quality assurance of products is to shorten the realisation time, reduce realisation costs, increase the quality of products and thus increase customer satisfaction. In a case study of a project of the concurrent realisation of products (components for the automotive industry), it is shown how the requirements of quality standards for the automotive industry can be integrated in processes of the concurrent product realisation project, based on track-and-loop principle and three strategies: parallelness, standardisation and integration. This article gives an overview of quality-related standards in the automotive industry, the principles of sequential and concurrent product realisation and the course of concurrent product realisation and quality assurance of products in the automotive industry. Five loops of concurrent product realisation processes are defined for the automotive industry, as well as seven milestones of advanced product quality planning. A course of concurrent realisation and quality assurance of products in the automotive industry is shown in the case of the concurrent realisation of a car component.
引用
收藏
页码:162 / 171
页数:10
相关论文
共 17 条
  • [1] Anisic Z, 2008, STROJ VESTN-J MECH E, V54, P607
  • [2] [Anonymous], 2002, 16949 SIST ISOTS
  • [3] *CHRYSL CORP, 1998, QUAL SYST REQ
  • [4] Chrysler Corporation Ford Motor Company General Motors Corporation, 1995, APQP ADV PROD QUAL P
  • [5] An empirical analysis of the competitive dimensions of quality performance in the automotive supply industry
    Curkovic, S
    Vickery, SK
    Droge, C
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2000, 20 (3-4) : 386 - 403
  • [6] Dickmann P, 2009, VDI-BUCH, P1, DOI 10.1007/978-3-540-79515-5
  • [7] Duhovnik J, 2001, CONCURRENT ENG-RES A, V9, P191, DOI 10.1106/978W-RX6J-RF0N-KWQA
  • [8] How to reduce new product development time
    Kusar, J
    Duhovnik, J
    Grum, J
    Starbek, M
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2004, 20 (01) : 1 - 15
  • [9] A case study of virtual team working in the European automotive industry
    May, A
    Carter, C
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2001, 27 (03) : 171 - 186
  • [10] Palcic I, 2010, STROJ VESTN-J MECH E, V56, P803