Assessing the security of electricity supply through multi-scale modeling: The TIMES-ANTARES linking approach

被引:30
作者
Alimou, Yacine [1 ,2 ]
Maizi, Nadia [1 ]
Bourmaud, Jean-Yves [2 ]
Li, Marion [2 ]
机构
[1] PSL Res Univ, Mines ParisTech, Ctr Appl Math, 1 Rue Claude Daunesse, F-06904 Sophia Antipolis, France
[2] Immeuble Window, Reseau Transport Elect, 7C Pl Dome, F-92073 Paris, La Defense, France
关键词
Low-carbon power system; Power generation adequacy; Multi-scale modeling; Long-term energy planning models; Short-term operational power system models; Model coupling; RENEWABLE ENERGY; INTERMITTENT SOURCES; INCREASING SHARES; POWER SECTOR; FUTURE; RELIABILITY; SYSTEM; REPRESENTATION; IMPACTS;
D O I
10.1016/j.apenergy.2020.115717
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Long-term energy planning models and dispatch simulations are two key stages in the methodology for a cost-effective transition to a low-carbon power system. Although these stages are equally important, they are often performed independently. This decoupled approach can lead to future investment trajectories decided by long-term energy planning models with no guarantee of a reliable electricity supply. To tackle this problem, the aim of this study was to develop a general methodological framework using a multi-model approach to address adequacy requirements in the long term. An automated soft-linking model was used to successively: i. Plan the optimal power generation mix to satisfy a given level of future expected electricity demand subject to various constraints using the TIMES framework (The Integrated MAR-KAL-EFOM System). ii. Assess the adequacy of the obtained power generation mix under several climatic and operational future states using the probabilistic operational open-source model ANTARES (A New Tool for the generation Adequacy Reporting of Electric Systems). iii. Implement iterative feedback loops based on the estimated ability of different generating technologies to support peak demand (capacity credit) to ensure a total firm capacity in line with the electricity supply criterion. This methodology was applied to a case study of power generation planning in France for the period 2013-2050. The results show that using TIMES alone provides a power generation mix for 2030 that risks insufficient supply levels. On the other hand, activating iterative feedback loops over capacity-credit exogenous parameters has the potential to ensure both the economic effectiveness of the mix and the security of the electricity supply criterion set by the French public authorities.
引用
收藏
页数:20
相关论文
共 57 条
[1]   A Systematic Review of Reliability Studies on Composite Power Systems: A Coherent Taxonomy Motivations, Open Challenges, Recommendations, and New Research Directions [J].
Abunima, Hamza ;
Teh, Jiashen ;
Lai, Ching-Ming ;
Jabir, Hussein Jumma .
ENERGIES, 2018, 11 (09)
[2]  
Allan RN, 1996, US RELIABILITY EVALU
[3]  
[Anonymous], 2017, Planning for the Renewable Future
[4]  
[Anonymous], 2018, FORECAST ASSESSMENT
[5]  
[Anonymous], 2015, 2015 IEEE Eindhoven PowerTech, DOI DOI 10.1109/PTC.2015.7232567
[6]  
[Anonymous], 2009, LEGAL CHALLENGES EU
[7]  
Blanco Marta Poncela., 2016, Generation Adequacy Methodolies Review
[8]   Operational flexibility and economics of power plants in future low-carbon power systems [J].
Brouwer, Anne Sjoerd ;
van den Broek, Machteld ;
Seebregts, Ad ;
Faaij, Andre .
APPLIED ENERGY, 2015, 156 :107-128
[9]  
Cardozo Carmen, 2016, Optimisation of Power System Security with High Share of Variable Renewables: Consideration of the Primary Reserve Deployment Dynamics on a Frequency Constrained Unit Commitment Model
[10]   A review of computer tools for analysing the integration of renewable energy into various energy systems [J].
Connolly, D. ;
Lund, H. ;
Mathiesen, B. V. ;
Leahy, M. .
APPLIED ENERGY, 2010, 87 (04) :1059-1082