共 65 条
[41]
Factors in productivity and unit cost for advanced machine guidance
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2002, 128 (05)
:367-374
[42]
KAMARA JM, 2003, CONSTRUCTION IT BRID, P178
[44]
KOHVAKKA A, 2001, FINNISH REAL ESTATE
[45]
*KOL, 2003, HLTH SAF TIM TAK CON
[46]
Kotter J.P., 1992, CORPORATE CULTURE PE
[47]
Leimeister J. M., 2001, ELECT J ORG VIRTUALN, V3, P13
[49]
LIU LY, 1995, P 2 C COMP CIV ENG, P1287
[50]
MAGDIC A, 2004, ITCON, V9, P409