A rescheduling and cost allocation mechanism for delayed arrivals

被引:9
|
作者
Rosenthal, Edward C. [1 ]
Eisenstein, Eric M. [1 ]
机构
[1] Temple Univ, Fox Sch Business, Dept Mkt & Supply Chain Management, Philadelphia, PA 19122 USA
关键词
Production scheduling; Vickrey-Clarke-Groves mechanism; Assignment problem; Combinatorial exchange; SCHEDULING AIRCRAFT LANDINGS; TRAFFIC FLOW MANAGEMENT; SEQUENCING GAMES; SLOT ALLOCATION; TIME; ALGORITHMS; QUEUE; OPTIMIZATION; OPERATIONS; AIRLINES;
D O I
10.1016/j.cor.2015.07.016
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We propose a solution to the problem of rescheduling a sequence of arrivals that are subject to a delay event at a common destination. Such situations include jobs arriving at a single production facility, aircraft whose landings are postponed, and ships that are inbound to a dock or lightering facility. Each arrival faces a nonlinear cost due to the delay, but the delay costs can be mitigated by allowing the arrivals to be reordered. We optimize the reordering process by designing a Vickrey-Clarke-Groves (VCG) mechanism to construct a payoff matrix describing the amounts necessary to move the currently assigned arrival slots either earlier or later. Using this payoff matrix, we compute the optimal reordering of the arrivals by utilizing the well-known solution to the assignment problem, which maximizes the benefit in a computationally efficient fashion. The VCG mechanism is strategyproof, that is, no arrival has an incentive to misreport the value of moving up or down in the sequence. We also show that participating in the centralized process is to no arrival's disadvantage. Because VCG procedures in general are subject to budget deficits, we provide alternative mechanisms to overcome this difficulty. Finally, we carry out computational experiments demonstrating that the VCG mechanism can be implemented for realistically-sized problem sets and that the cost savings are significant. (c) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:20 / 28
页数:9
相关论文
共 50 条
  • [1] Cost allocation in rescheduling with machine unavailable period
    Liu, Zhixin
    Lu, Liang
    Qi, Xiangtong
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (01) : 16 - 28
  • [2] Optimal allocation of arrivals to a collection of parallel workstations
    Tavana, M
    Rappaport, J
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1997, 17 (3-4) : 305 - &
  • [3] Multiagent Resource Allocation for Dynamic Task Arrivals with Preemption
    Doucette, John A.
    Pinhey, Graham
    Cohen, Robin
    ACM TRANSACTIONS ON INTELLIGENT SYSTEMS AND TECHNOLOGY, 2016, 8 (01)
  • [4] Vehicle Rescheduling with Delivery Delay Considering Perceived Waiting Cost of Heterogeneous Customers
    Wu, Lirong
    Zhang, Hang
    PROCESSES, 2022, 10 (12)
  • [5] Optimal berth allocation under regular and emergent vessel arrivals
    Al-Refaie, Abbas
    Abedalqader, Hala
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART M-JOURNAL OF ENGINEERING FOR THE MARITIME ENVIRONMENT, 2021, 235 (02) : 642 - 656
  • [6] Minimizing Total Cost in Outpatient Scheduling with Unpunctual Arrivals
    Fan, Yue
    Hu, Qiying
    2016 13TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, 2016,
  • [7] A Novel Cost Allocation Mechanism for Local Flexibility in the Power System with Partial Disintermediation
    Sleisz, Adam
    Divenyi, Daniel
    Polgari, Beata
    Sores, Peter
    Raisz, David
    ENERGIES, 2022, 15 (22)
  • [8] Reserve Cost Allocation Mechanism in Renewable Portfolio Standard-Constrained Spot Market
    Jiang, Kai
    Wang, Peng
    Wang, Jianxiao
    Liu, Nian
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2022, 13 (01) : 56 - 66
  • [9] Rescheduling Urban Rail Transit Trains to Serve Passengers from Uncertain Delayed High-Speed Railway Trains
    Wang, Wanqi
    Bao, Yun
    Long, Sihui
    SUSTAINABILITY, 2022, 14 (09)
  • [10] Minimal Cost Stable Workforce Allocation in Presence of Ties
    Gharote, M. S.
    Patil, R. J.
    Lodha, S. P.
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1146 - 1150