OPTIMISING THE OPERATIONAL ENERGY EFFICIENCY OF AN OPEN-PIT COAL MINE SYSTEM

被引:1
|
作者
Patterson, Samuel [1 ]
机构
[1] Queensland Univ Technol, 2 George St, Brisbane, Qld 4000, Australia
关键词
integrated model; hybrid metaheuristic; decision support; energy efficiency; open-pit coal mining; TRUCK ALLOCATION;
D O I
10.1017/S0004972716000794
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
[No abstract available]
引用
收藏
页码:174 / 176
页数:3
相关论文
共 50 条
  • [31] Comprehensive evaluation of potential coal mine dust emissions in an open-pit coal mine in Northwest China
    Trechera, Pedro
    Moreno, Teresa
    Cordoba, Patricia
    Moreno, Natalia
    Zhuang, Xinguo
    Li, Baoqing
    Li, Jing
    Shangguan, Yunfei
    Dominguez, Ana Oliete
    Kelly, Frank
    Querol, Xavier
    INTERNATIONAL JOURNAL OF COAL GEOLOGY, 2021, 235
  • [32] A METHOD FOR EVALUATING THE ENERGY CHARACTERISTICS OF THE AIR IN AN OPEN-PIT MINE
    BAKLANOV, AA
    SOVIET MINING SCIENCE USSR, 1986, 22 (01): : 66 - 70
  • [33] ECSTALL STORY - OPEN-PIT MINE
    COUPLAND, GC
    CIM BULLETIN, 1974, 67 (745): : 64 - 69
  • [34] Efficient simulation for an open-pit mine
    Dendle, Nicholas
    Isokangas, Erik
    Corry, Paul
    SIMULATION MODELLING PRACTICE AND THEORY, 2022, 117
  • [35] Solving Challenges at an Open-Pit Mine
    GPS World, 2021, 32 (04): : 24 - 25
  • [36] TRUCK REQUIREMENTS IN AN OPEN-PIT MINE
    MADGE, DN
    OPERATIONS RESEARCH, 1963, 11 : B123 - B123
  • [37] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &
  • [38] Case study of establishing a safe blasting criterion for the pit slopes of an open-pit coal mine
    Choi, Byung-Hee
    Ryu, Chang-Ha
    Deb, Debasis
    Jung, Yong-Bok
    Jeong, Ju-Hwan
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2013, 57 : 1 - 10
  • [39] Route selection algorithm of open-pit mine transportation system
    Liu G.
    Chai S.
    Bai R.
    Zhao J.
    Li H.
    Zhang J.
    Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (12): : 3931 - 3940
  • [40] An edge-prior DEM construction algorithm for open-pit coal mine
    School of Mining, Liaoning Technical University, Fuxin
    123000, China
    不详
    123000, China
    Meitan Xuebao, 8 (1827-1833):