A nearly optimal inspection policy for a two-component series system
被引:0
|
作者:
Maaroufi, Ghofrane
论文数: 0引用数: 0
h-index: 0
机构:
ESSTT, CEREP, 5 Ave Taha Hussein,BP 56 Bab Menara, Tunis 1008, TunisiaESSTT, CEREP, 5 Ave Taha Hussein,BP 56 Bab Menara, Tunis 1008, Tunisia
Maaroufi, Ghofrane
[1
]
Chelbi, Anis
论文数: 0引用数: 0
h-index: 0
机构:
ESSTT, CEREP, 5 Ave Taha Hussein,BP 56 Bab Menara, Tunis 1008, TunisiaESSTT, CEREP, 5 Ave Taha Hussein,BP 56 Bab Menara, Tunis 1008, Tunisia
Chelbi, Anis
[1
]
Rezg, Nidhal
论文数: 0引用数: 0
h-index: 0
机构:
ENIM, LGIPM, F-57045 Metz 01, FranceESSTT, CEREP, 5 Ave Taha Hussein,BP 56 Bab Menara, Tunis 1008, Tunisia
Rezg, Nidhal
[2
]
Ait-Kadi, Daoud
论文数: 0引用数: 0
h-index: 0
机构:
Univ Laval, Dept Genie Mecan, Quebec City, PQ, CanadaESSTT, CEREP, 5 Ave Taha Hussein,BP 56 Bab Menara, Tunis 1008, Tunisia
Ait-Kadi, Daoud
[3
]
机构:
[1] ESSTT, CEREP, 5 Ave Taha Hussein,BP 56 Bab Menara, Tunis 1008, Tunisia
[2] ENIM, LGIPM, F-57045 Metz 01, France
[3] Univ Laval, Dept Genie Mecan, Quebec City, PQ, Canada
来源:
PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT
|
2011年
This paper deals with a condition based maintenance policy for a series system made of two components subject to gradual deterioration and whose failures are not self-announcing and can be detected only through inspection. An inspection consists in measuring one control parameter for each component and comparing the obtained value with a predefined corresponding alarm threshold level. At this point, a decision should be made based on the inspections results, doing preventive or corrective replacements respectively when one component threshold level is exceeded or when it is found in a failure state, or do nothing in case neither of the two alarm thresholds is found above the corresponding alarm threshold level. A preventive replacement of a component is performed in case the other one has to be replaced. A mathematical model and a numerical procedure are developed in order to generate a nearly optimal inspection sequence (inspection instants) which minimizes the average total cost per time unit induced by both inspection and maintenance actions over an infinite horizon. Numerical results are presented and discussed.
机构:
City Univ Hong Kong, Dept Management Sci, Kowloon, Hong Kong, Peoples R ChinaCity Univ Hong Kong, Dept Management Sci, Kowloon, Hong Kong, Peoples R China
Leung, K. N. F.
Zhang, Y. L.
论文数: 0引用数: 0
h-index: 0
机构:
Southeast Univ, Dept Math, Nanjing, Peoples R ChinaCity Univ Hong Kong, Dept Management Sci, Kowloon, Hong Kong, Peoples R China
Zhang, Y. L.
Lai, K. K.
论文数: 0引用数: 0
h-index: 0
机构:
City Univ Hong Kong, Dept Management Sci, Kowloon, Hong Kong, Peoples R ChinaCity Univ Hong Kong, Dept Management Sci, Kowloon, Hong Kong, Peoples R China