On the meaning of 'Waste': review and definition

被引:39
作者
Thurer, Matthias [1 ]
Tomasevic, Ivan [2 ]
Stevenson, Mark [3 ]
机构
[1] Jinan Univ Zhuhai Campus, Inst Phys Internet, Sch Elect & Informat Engn, Zhuhai, Peoples R China
[2] Univ Belgrade, Fac Org Sci, Belgrade, Serbia
[3] Univ Lancaster, Sch Management, Dept Management Sci, Lancaster, England
基金
中国国家自然科学基金;
关键词
Waste; lean; buffer; systematic literature review; LEAN SUPPLY CHAIN; PERFORMANCE; DESIGN; IMPLEMENTATION; METHODOLOGY; FRAMEWORK; SERVICE; IMPROVEMENT; PRINCIPLES; MANAGEMENT;
D O I
10.1080/09537287.2016.1264640
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Waste reduction is one of the main principles of lean, but it has been taken for granted that we have a common understanding of what waste means. We first present a critical, qualitative discussion that identifies four distinct waste concepts. We then conduct a systematic review of the literature that examines the different uses of these concepts. We find that only the classic concept of the seven wastes and the concept of waste as non-value-adding activity are widely applied. However, both concepts are, at times, not only incompatible but used in a way that leads to open contradiction. A new definition, centred on an efficient, timely transformation process seeks to consolidate the literature. We outline two distinct waste types: (i) obvious waste, to refer to any waste that can be reduced without creating another form of waste; and, (ii) buffer waste, to refer to any waste that cannot be reduced without creating another waste. The paper has important implications for practice. To reduce waste, managers must undertake three interlinked tasks: the elimination of obvious waste; the reduction of variability to transform buffers into obvious waste; and, the balancing of remaining buffers to best achieve performance targets. The paper supports managers in their endeavours to identify waste, which is an important precursor to waste reduction/elimination.
引用
收藏
页码:244 / 255
页数:12
相关论文
共 67 条
[1]  
Akinc U., 1993, J OPER MANAG, V11, P107
[2]  
[Anonymous], 1986, OUT CRISIS
[3]  
[Anonymous], 2001, 4 PRACTICAL REVOLUTI
[4]  
[Anonymous], 2003, CONTENT ANAL INTRO I
[5]  
Arbós LC, 2002, INT J PROD ECON, V80, P169, DOI 10.1016/S0925-5273(02)00316-X
[6]   Value stream analysis of a re-engineered construction supply chain [J].
Arbulu, RJ ;
Tommelein, ID ;
Walsh, KD ;
Hershauer, JC .
BUILDING RESEARCH AND INFORMATION, 2003, 31 (02) :161-171
[7]   Observation: A Lean tool for improving the effectiveness of Lean Six Sigma [J].
Arumugam, V. ;
Antony, Jiju ;
Douglas, Alex .
TQM Journal, 2012, 24 (03) :275-287
[8]   Lean manufacturing: literature review and research issues [J].
Bhamu, Jaiprakash ;
Sangwan, Kuldip Singh .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2014, 34 (07) :876-940
[9]  
Bicheno J., 2008, THE LEAN TOOLBOX, V4th
[10]   'Lean first, then automate': a framework for process improvement in pure service companies. A case study [J].
Bortolotti, Thomas ;
Romano, Pietro .
PRODUCTION PLANNING & CONTROL, 2012, 23 (07) :513-522