Project risk management: A deterministic quantitative technique for assessment and mitigation

被引:69
作者
Muriana, Cinzia [1 ,3 ]
Vizzini, Giovanni [2 ,3 ]
机构
[1] IRCCS ISMETT, Ist Mediterraneo Trapianti & Terapie, Grants & Project Management Div, Palermo, Italy
[2] IRCCS ISMETT Ist Mediterraneo Trapianti & Terapie, Dept Treatment & Study Abdominal Dis & Abdominal, Palermo, Italy
[3] UPMC, Palermo, Italy
关键词
Risk assessment; Risk prevention; Risk mitigation; Risk management; Project risk management; Work Progress Status; European work programs; EARNED VALUE MANAGEMENT; SOFTWARE PROJECTS; SCHEDULE; MODEL; COST; FRAMEWORK; ALGORITHM; DURATION; QUALITY; INDEXES;
D O I
10.1016/j.ijproman.2017.01.010
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper presents a deterministic technique for assessing and preventing project risks, by determining the risk of the Work Progress Status. Firstly, the performance of the input factors, namely the costs, quality, and time, are detected, that reflect the Iron Triangle of the Project Management. As each phase ends, the actual values of the input factors are detected and compared with that planned, and corrective actions are taken for considering the impact of the actual performances on the overall project. Thus, the current risk degree of the project is determined through the Weighted Sum Method. If it is higher than planned, preventive actions are taken, in order to mitigate the risk of the entire project. Practical applications of the technique relate to routine projects and those cases in which the schedule/costs/requirements are to be defined in the planning phase, and deviations are detected in the progress phase. (C) 2017 Elsevier Ltd. APM and IPMA. All rights reserved.
引用
收藏
页码:320 / 340
页数:21
相关论文
共 44 条
  • [1] Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques
    Acebes, Fernando
    Pereda, Maria
    Poza, David
    Pajares, Javier
    Manuel Galan, Jose
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (07) : 1597 - 1609
  • [2] Beyond Earned Value Management: A Graphical Framework for Integrated Cost, Schedule and Risk Monitoring
    Acebes, Fernando
    Pajares, Javier
    Manuel Galan, Jose
    Lopez-Paredes, Adolfo
    [J]. SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 181 - 189
  • [3] A new approach for project control under uncertainty. Going back to the basics
    Acebes, Fernando
    Pajares, Javier
    Manuel Galan, Jose
    Lopez-Paredes, Adolfo
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (03) : 423 - 434
  • [4] [Anonymous], 2009, HDB RES SYNTHESIS ME
  • [5] [Anonymous], 2021, GUID PROJ MAN BOD KN, V7th
  • [6] Atkinson R., 1999, Int. J. Proj. Manag., V17, P337, DOI [DOI 10.1016/S0263-7863(98)00069-6, 10.1016/S0263-7863(98)00069-6]
  • [7] Cantore A., 2008, INGLESE IMPRESA READ
  • [8] Earned value project management: Improving the predictive power of planned value
    Chen, Hong Long
    Chen, Wei Tong
    Lin, Ying Lien
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (01) : 22 - 29
  • [9] A multivariate approach for top-down project control using earned value management
    Colin, Jeroen
    Martens, Annelies
    Vanhoucke, Mario
    Wauters, Mathieu
    [J]. DECISION SUPPORT SYSTEMS, 2015, 79 : 65 - 76
  • [10] Setting tolerance limits for statistical project control using earned value management
    Colin, Jeroen
    Vanhoucke, Mario
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 49 : 107 - 122