Research on overvoltage and minimum air clearance on 1000kV AC side of converter transformer in ±1100kV Guquan converter station

被引:2
|
作者
Lou Ying [1 ,2 ]
Li Zhenqiang [1 ,2 ]
Xie Liang [1 ,2 ]
Wan Lei [1 ,2 ]
机构
[1] China Elect Power Res Inst, Wuhan Branch, State Key Lab Power Grid Environm Protect, Wuhan 430074, Hubei, Peoples R China
[2] China Elect Power Res Inst, Wuhan 430074, Hubei, Peoples R China
来源
关键词
HVDC power convertors; power system transients; power transmission lines; overvoltage protection; flashover; poles and towers; power grids; HVDC power transmission; power transformers; substations; UHV DC projects; minimum air clearance; AC side; converter transformer; AC power grid; electrode flashover characteristics; general UHV AC projects; relevant overvoltage calculation; related AC system; power frequency overvoltage; phase-to-phase overvoltage; phase-to-phase air clearances; Guquan converter station; long wave-front; Wannan convertor station; voltage; 1100; 0; kV; 1000;
D O I
10.1049/joe.2018.8904
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the hierarchically connected ultra-high voltage (UHV) DC projects, the minimum air clearance on the 1000kV AC side of converter transformer directly affects the layout and area of the valve hall. The minimum air clearance is determined by the overvoltage and the flashover characteristics of different electrodes. Since the UHV DC projects are hierarchically connected to the AC power grid, the overvoltage and the electrode flashover characteristics are different from that of general UHV AC projects, necessitating the relevant overvoltage calculation and test studies. The electromagnetic transients software PSCAD is used for modelling of the +/- 1100kV Wannan convertor station and the related AC system. The power frequency overvoltage, switching overvoltage, time-to-crest value, and coefficient of phase-to-phase overvoltage on the AC side of the 1000kV converter transformer are calculated. Tests are carried out on air clearances between bundle conductors, tubular buses, and equipment grading rings under switching impulse with 1000s long wave-front. The minimum phase-to-earth and phase-to-phase air clearances on the 1000kV AC side of the converter transformer are given.
引用
收藏
页码:2159 / 2164
页数:6
相关论文
共 24 条
  • [21] Research on Unbalance Phase Current of 500kV AC Transmission Line in Yibin UHV Converter Station
    Tang, M.
    Zhang, C.
    Li, M.
    Ding, L. J.
    Zhang, H.
    Wei, W.
    Tang, F.
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND MANAGEMENT INNOVATION, 2015, 28 : 188 - 193
  • [22] Research on Fire Suppression Characteristics of Compressed Air Foams in Full-Scale 220 kV Converter Transformer
    Guo, Yike
    Chen, Tao
    Zhou, Biao
    Zhang, Peng
    Wang, Yuwei
    Wang, Xuyao
    Hao, Danping
    FIRE-SWITZERLAND, 2025, 8 (01):
  • [23] Experimental Research of Oil Arc Transferred and Extinguished by AC 550 kV Triggered Gap for UHV Converter Transformer to Prevent Deflagrate
    Li, Zhibing
    Li, Xiaoang
    Zhang, Ran
    Xu, Xiaodong
    Zheng, Zhanfeng
    Lin, Jinyang
    Gaodianya Jishu/High Voltage Engineering, 2024, 50 (10): : 4329 - 4337
  • [24] Research on the dynamic characteristics of electric field distribution of the ± 1100 kV Ultra high voltage converter transformer valve-side bushing using weakly ionised gas conductance model
    Wang, Qingyu
    Liu, Peng
    Tian, Huidong
    Xie, Gengsheng
    Peng, Zongren
    Yang, Xi
    HIGH VOLTAGE, 2022, 7 (02) : 288 - 301