Research on overvoltage and minimum air clearance on 1000kV AC side of converter transformer in ±1100kV Guquan converter station

被引:2
|
作者
Lou Ying [1 ,2 ]
Li Zhenqiang [1 ,2 ]
Xie Liang [1 ,2 ]
Wan Lei [1 ,2 ]
机构
[1] China Elect Power Res Inst, Wuhan Branch, State Key Lab Power Grid Environm Protect, Wuhan 430074, Hubei, Peoples R China
[2] China Elect Power Res Inst, Wuhan 430074, Hubei, Peoples R China
来源
关键词
HVDC power convertors; power system transients; power transmission lines; overvoltage protection; flashover; poles and towers; power grids; HVDC power transmission; power transformers; substations; UHV DC projects; minimum air clearance; AC side; converter transformer; AC power grid; electrode flashover characteristics; general UHV AC projects; relevant overvoltage calculation; related AC system; power frequency overvoltage; phase-to-phase overvoltage; phase-to-phase air clearances; Guquan converter station; long wave-front; Wannan convertor station; voltage; 1100; 0; kV; 1000;
D O I
10.1049/joe.2018.8904
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the hierarchically connected ultra-high voltage (UHV) DC projects, the minimum air clearance on the 1000kV AC side of converter transformer directly affects the layout and area of the valve hall. The minimum air clearance is determined by the overvoltage and the flashover characteristics of different electrodes. Since the UHV DC projects are hierarchically connected to the AC power grid, the overvoltage and the electrode flashover characteristics are different from that of general UHV AC projects, necessitating the relevant overvoltage calculation and test studies. The electromagnetic transients software PSCAD is used for modelling of the +/- 1100kV Wannan convertor station and the related AC system. The power frequency overvoltage, switching overvoltage, time-to-crest value, and coefficient of phase-to-phase overvoltage on the AC side of the 1000kV converter transformer are calculated. Tests are carried out on air clearances between bundle conductors, tubular buses, and equipment grading rings under switching impulse with 1000s long wave-front. The minimum phase-to-earth and phase-to-phase air clearances on the 1000kV AC side of the converter transformer are given.
引用
收藏
页码:2159 / 2164
页数:6
相关论文
共 24 条
  • [1] The Feasibility Study of ±1100kV On-site Assembled ±1100kV Converter Transformer
    Guan Jianxin
    Jia Pengfei
    Zhang Shuqi
    Yu Xinru
    Wu Chao
    2018 IEEE INTERNATIONAL CONFERENCE ON HIGH VOLTAGE ENGINEERING AND APPLICATION (ICHVE), 2018,
  • [2] Research on optimisation of minimum air clearance of 1000kV UHV AC substation
    Li Zhenqiang
    Xie Liang
    Liu Jing
    He Huiwen
    JOURNAL OF ENGINEERING-JOE, 2019, (16): : 2687 - 2692
  • [3] Overvoltage and insulation coordination for ±1100 kV UHVDC converter station
    Zhou, H. (zhouhao_ee@zju.edu.cn), 2013, Science Press (39):
  • [4] Switching Overvoltage Characteristics of ±1100-kV UHVDC Converter Station
    Wang, Dongju
    Zhou, Hao
    Deng, Xu
    IEEE TRANSACTIONS ON POWER DELIVERY, 2015, 30 (03) : 1205 - 1212
  • [5] Research on ferroresonance overvoltage occurred in 500 kV transformer for power supply of converter station
    Zhang, X. (zdk_04@163.com), 1600, Power System Technology Press (36):
  • [6] Study on Integrated Aging Characteristics of DC MOV in ±1100kV Converter Station
    Fu Y.
    Yue B.
    Yu F.
    Wei Q.
    Guo J.
    Yu, Fang (megpet@stu.xjtu.edu.cn), 1600, Power System Technology Press (44): : 3149 - 3155
  • [7] Optimizationofair gap clearance in 750 kV converter station area on AC side of ±800 kV UHVDC project
    China Electric Power Research Institute, Haidian District, Beijing
    100192, China
    Dianwang Jishu, 10 (2935-2940):
  • [8] Research on DC component decay time constant of 1000kV AC filter circuit breakers in UHV converter station
    Li Zhenqiang
    Fan Mian
    He Ying
    Zha Zhipeng
    JOURNAL OF ENGINEERING-JOE, 2019, (16): : 2362 - 2365
  • [9] Study on clearance optimisation and altitude correction of 750 kV AC side for UHVDC converter transformer
    Ding, Yujian
    Yao, Xiuyuan
    Gu, Chen
    Wang, Xi
    JOURNAL OF ENGINEERING-JOE, 2019, (16): : 2480 - 2483
  • [10] Simulation and Optimization Design of Isolating Switch in the Indoor DC Yard of ±1100kV Converter Station
    Yang, Zonghan
    Wang, Jialong
    Ding, Yujian
    Mao, Yan
    Li, He
    Liu, Peng
    Peng, Zongren
    2019 IEEE CONFERENCE ON ELECTRICAL INSULATION AND DIELECTRIC PHENOMENA (CEIDP), 2019, : 218 - 221