Heuristics for assembly operation scheduling problem in flexible assembly systems

被引:4
|
作者
Jeong, Bongju
Sim, Seung-Bae
Jung, Hosang [1 ]
机构
[1] Virginia Polytech Inst & State Univ, Grado Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
[2] Yonsei Univ, Dept Informat & Ind Engn, Seodaemun Ku, Seoul 120749, South Korea
[3] Korea Inst Def Analyses, Ctr Def Informationalizat Studies, Seoul 130650, South Korea
来源
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 2006年 / 29卷 / 9-10期
关键词
assembly operation; flexible assembly systems; parallel processors scheduling problem;
D O I
10.1007/s00170-005-2605-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper we address the problem of scheduling n assembly operations with in-tree constraints on m unrelated parallel workstations in flexible assembly systems, which we call the assembly operation scheduling problem (AOSP). No preemption of assembly operations is allowed and the primary objective is to minimize the maximum completion time. This problem is equivalent to R vertical bar tree vertical bar C-max. For this notorious NP-hard problem, four heuristic algorithms including decomposition (DECOMP), earliest completion time (ECT), shortest processing time (SPT), and earliest starting time(EST) heuristic are proposed and their performances are comparatively investigated. DECOMP uses a decomposition technique to practically solve this problem. The assembly operation tree is decomposed and then AOSP is reduced to a set of subproblems of R vertical bar vertical bar C-max and R,r(j)vertical bar r(i)vertical bar C-max. Two efficient heuristics were proposed for the reduced subproblems. The other three heuristics basically use the machine selection rules to determine the machine for processing the current operation. Of these heuristics, DECOMP showed the best performance in terms of quality of schedule. Computational results show that all the proposed algorithms except the EST heuristic perform quite well in terms of both quality of solution and computation time.
引用
收藏
页码:1033 / 1040
页数:8
相关论文
共 34 条
  • [1] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Bongju Jeong
    Seung-Bae Sim
    Hosang Jung
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1033 - 1040
  • [2] Modelling, simulation and scheduling of flexible assembly systems with coloured Petri nets
    Chetty, OVK
    Gnanasekaran, OC
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1996, 11 (06): : 430 - 438
  • [3] A method for the design of flexible assembly systems
    Bellgran, M
    Johansson, C
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 41 (1-3) : 93 - 102
  • [4] Metaheuristics for a Flexible Assembly System Design Problem
    Jacobson S.H.
    Johnson A.W.
    Sullivan K.A.
    Fleischer M.A.
    Kumar A.
    Journal of Heuristics, 1997, 3 (2) : 139 - 159
  • [5] Cyclic robot scheduling for 3D printer-based flexible assembly systems
    Kim, Hyun-Jung
    Lee, Jun-Ho
    ANNALS OF OPERATIONS RESEARCH, 2021, 298 (1-2) : 339 - 359
  • [6] Cyclic robot scheduling for 3D printer-based flexible assembly systems
    Hyun-Jung Kim
    Jun-Ho Lee
    Annals of Operations Research, 2021, 298 : 339 - 359
  • [7] Kinematic couplings for pallets in flexible assembly systems
    Vallance, RR
    Slocum, AH
    PROCEEDINGS OF THE FIFTEENTH ANNUAL MEETING OF THE AMERICAN SOCIETY FOR PRECISION ENGINEERING, 2000, : 248 - 251
  • [8] Computational analysis of a flexible assembly system design problem
    Kumar, A
    Jacobson, SH
    Sewell, EC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 123 (03) : 453 - 472
  • [9] An integrated design support method for flexible assembly systems
    Lee, HF
    Stecke, KE
    JOURNAL OF MANUFACTURING SYSTEMS, 1996, 15 (01) : 13 - 32
  • [10] Hybrid fexible assembly systems (H-FAS): bridging the gap between traditional and fully flexible assembly systems
    Giulio Rosati
    Maurizio Faccio
    Luca Barbazza
    Aldo Rossi
    The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1289 - 1301