A rolling horizon approach for material requirement planning under fuzzy lead times

被引:18
作者
Diaz-Madronero, Manuel [1 ]
Mula, Josefa [1 ]
Jimenez, Mariano [2 ]
Peidro, David [1 ]
机构
[1] Univ Politecn Valencia, Res Ctr Prod Management & Engn CIGIP, Alicante, Spain
[2] Univ Basque Country, Dept Appl Econ, UPV EHU, San Sebastian, Spain
关键词
MRP; uncertainty; fuzzy methods; multi-objective optimisation; rolling horizon; MATHEMATICAL-PROGRAMMING APPROACH; SERIAL PRODUCTION SYSTEMS; OF-THE-ART; ASSEMBLY SYSTEMS; MRP ENVIRONMENTS; SUPPLY CHAINS; UNCERTAINTY; MODEL; LEADTIMES; CONSTRAINTS;
D O I
10.1080/00207543.2016.1223382
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a fuzzy multi-objective integer linear programming (FMOILP) approach to model a material requirement planning (MRP) problem with fuzzy lead times. The objective functions minimise the total costs, back-order quantities and idle times of productive resources. Capacity constraints are included by considering overtime resources. Into the crisp MRP multi-objective model, we incorporate the possibility of occurrence of each uncertain lead time using fuzzy numbers. Then FMOILP is transformed into an auxiliary crisp mixed-integer linear programming model by a fuzzy goal programming approach for each fuzzy lead time combination. In order to defuzzify the set of solutions associated with each fuzzy lead time combination, a solution method based on the centre of gravity concept is addressed. Model validation with a numerical example is carried out by a novel rolling horizon procedure where uncertain lead times are updated during each planning period according to the centre of gravity obtained. For illustration purposes, the proposed solution approach is satisfactorily compared to a rolling horizon approach in which lead times are allocated when the possibility of occurrence is established at one.
引用
收藏
页码:2197 / 2211
页数:15
相关论文
共 51 条
[1]   A bibliography of non-deterministic lot-sizing models [J].
Aloulou, Mohamed Ali ;
Dolgui, Alexandre ;
Kovalyov, Mikhail Y. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) :2293-2310
[2]  
[Anonymous], INT J PRODUCTION RES
[3]  
[Anonymous], MANAGE SCI
[4]  
Baker KR., 1977, DECISION SCI, V8, P19, DOI [10.1111/j.1540-5915.1977.tb01065.x, DOI 10.1111/J.1540-5915.1977.TB01065.X]
[5]  
Ben Ammar Oussama, 2014, WORLD C, V19, P778
[6]  
Ben Ammar Oussama, 2013, MANUFACTURING MODELL, V7, P359
[7]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[8]   Fuzzy estimations and system dynamics for improving supply chains [J].
Campuzano, Francisco ;
Mula, Josefa ;
Peidro, David .
FUZZY SETS AND SYSTEMS, 2010, 161 (11) :1530-1542
[9]   Fuzzy goal programming for material requirements planning under uncertainty and integrity conditions [J].
Diaz-Madronero, Manuel ;
Mula, Josefa ;
Jimenez, Mariano .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (23) :6971-6988
[10]   On a model of joint control of reserves in automatic control systems of production [J].
Dolgii, AB .
AUTOMATION AND REMOTE CONTROL, 2001, 62 (12) :2020-2026