Planning and scheduling at STScI: from Hubble to the James Webb Space Telescope

被引:2
作者
Adler, David S. [1 ]
Kinzel, Wayne [1 ]
Jordan, Ian [1 ]
机构
[1] Space Telescope Sci Inst, CSC, Baltimore, MD 21218 USA
来源
OBSERVATORY OPERATIONS: STRATEGIES, PROCESSES, AND SYSTEMS V | 2014年 / 9149卷
关键词
Hubble Space Telescope; James Webb Space Telescope; Observatory Operations; Planning and Scheduling; Process Improvements; EFFICIENCY;
D O I
10.1117/12.2054932
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
While HST's planning and scheduling processes are mature, JWST's with a planned 2018 launch are still in development. The STScI science, engineering, software, and operations teams are working together to get the JWST planning and scheduling systems up and running in the next few years. Here, we review the improvements made to HST's planning and scheduling processes over the past three decades, as well as the current state of the observing program. Also, differences between the two telescopes are discussed, as well as how they affect the creation of the JWST planning and scheduling system.
引用
收藏
页数:14
相关论文
共 16 条
  • [1] Adler D.S., 2012, P SOC PHOTO-OPT INS, V8448, P8448
  • [2] Twelve years of planning and scheduling the Hubble Space Telescope: process improvements and the related observing efficiency gains
    Adler, DS
    Taylor, DK
    Patterson, AP
    [J]. OBSERVATORY OPERATIONS TO OPTIMIZE SCIENTIFIC RETURN III, 2002, 4844 : 111 - 121
  • [3] Anderson J., 2009, JWSTSTSCI001558
  • [4] [Anonymous], 1982, DES REF MISS SE 01
  • [5] Balzano V., 2010, P SPIE, V7737
  • [6] Gordon K. D., 2012, JWSTSTSCICI000045
  • [7] Henry R., 2012, P SOC PHOTO-OPT INS, V8448
  • [8] Henry R., 2010, JWSTSTSCI0001816
  • [9] Hur-Diaz S., 2008, FL MARKL ASTR S
  • [10] Johnston D., 1994, Intelligent Scheduling, P391