A Geometric Programming to Importance Sampling for Power System Reliability Evaluation

被引:16
作者
Yan, Chao [1 ]
Ding, Tao [1 ]
Bie, Zhaohong [1 ]
Wang, Xifan [1 ]
机构
[1] Xi An Jiao Tong Univ, Sch Elect Engn, Xian 710049, Peoples R China
基金
中国国家自然科学基金;
关键词
Geometric programming (GP); importance sampling (IS); power system reliability; variance minimization (VM); CROSS-ENTROPY;
D O I
10.1109/TPWRS.2016.2568751
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A novel Geometric Programming (GP) is presented in the first time by the optimization model of importance sampling parameters (ISP) in Variance Minimization (VM) for importance sampling (IS) of power system reliability evaluation. The key point of the proposed method is that the equality constraints of VM optimization model can be relaxed into inequalities because of its special structure, thus a new GP-VM convex optimization model can be built exactly to solve the difficulty of obtaining the optimal ISP. Numerical results of two test systems verify the effectiveness of the proposed method.
引用
收藏
页码:1568 / 1569
页数:2
相关论文
共 7 条
  • [1] [Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
  • [2] A tutorial on geometric programming
    Boyd, Stephen
    Kim, Seung-Jean
    Vandenberghe, Lieven
    Hassibi, Arash
    [J]. OPTIMIZATION AND ENGINEERING, 2007, 8 (01) : 67 - 127
  • [3] Improved cross-entropy method for estimation
    Chan, Joshua C. C.
    Kroese, Dirk P.
    [J]. STATISTICS AND COMPUTING, 2012, 22 (05) : 1031 - 1040
  • [4] Chan JCC, 2011, J APPL PROBAB, V48A, P183
  • [5] Composite Systems Reliability Evaluation Based on Monte Carlo Simulation and Cross-Entropy Methods
    Gonzalez-Fernandez, Reinaldo A.
    Leite da Silva, Armando M.
    Resende, Leonidas C.
    Schilling, Marcus T.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) : 4598 - 4606
  • [6] Generating Capacity Reliability Evaluation Based on Monte Carlo Simulation and Cross-Entropy Methods
    Leite da Silva, Armando M.
    Fernandez, Reinaldo A. G.
    Singh, Chanan
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (01) : 129 - 137
  • [7] A Cross-Entropy-Based Three-Stage Sequential Importance Sampling for Composite Power System Short-Term Reliability Evaluation
    Wang, Yue
    Guo, Chuangxin
    Wu, Q. H.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) : 4254 - 4263