A nonlinearly normalized back propagation network and cloud computing approach for determining cycle time allowance during wafer fabrication

被引:7
作者
Chen, Toly [1 ]
Wang, Yi-Chi [1 ]
机构
[1] Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung, Taiwan
关键词
Internal due date assignment; Allowance determination; Upper bound; Wafer fabrication; Back propagation network; DUE-DATE ASSIGNMENT; TAGUCHIS DESIGN; NEURAL-NETWORKS; PREDICTION; SYSTEM; SOM; COMPETITIVENESS; SUSTAINABILITY; RULES;
D O I
10.1016/j.rcim.2015.11.005
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study investigated the determination of the allowance that must be added to the cycle time estimate, which is a critical concern when assigning internal due dates. Because no method for estimating cycle times is completely accurate, producing such estimates remains problematic but has rarely been addressed in the literature. A large allowance postpones the internal due date, diminishing company appeal when a factory manager negotiates with a customer. Therefore, in this study, a nonlinear approach was proposed to normalize the cycle times. After estimating the cycle time of a job by using a back propagation network, the allowance added to the cycle time can be effectively reduced through the collaboration of several computing clouds. Theoretical properties of the proposed method were validated, and a case from a wafer fabrication factory was used to evaluate the effectiveness of the proposed method in comparison with various existing methods. According to the experimental results, the proposed method facilitated establishing tight upper bounds on the cycle times. The proposed method was proven to be very effective. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:144 / 156
页数:13
相关论文
共 53 条
[1]  
[Anonymous], 2011, 800145 NIST
[2]   Setting optimal due dates in a basic safe-scheduling model [J].
Baker, Kenneth R. .
COMPUTERS & OPERATIONS RESEARCH, 2014, 41 :109-114
[3]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[4]   Gene expression programming based due date assignment in a simulated job shop [J].
Baykasoglu, Adil ;
Gocken, Mustafa .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (10) :12143-12150
[5]   Prediction of surface roughness in CNC face milling using neural networks and Taguchi's design of experiments [J].
Benardos, PG ;
Vosniakos, GC .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2002, 18 (5-6) :343-354
[6]  
Bonnans JF, 2006, NUMERICAL OPTIMIZATI, V2nd, DOI 10.1007/978-3-662-05078-1
[7]  
Chang P.-C., 2001, P INT C CAS BAS REAS
[8]   Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory [J].
Chang, PC ;
Liao, TW .
APPLIED SOFT COMPUTING, 2006, 6 (02) :198-206
[9]   Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory [J].
Chang, PC ;
Hieh, JC ;
Liao, TW .
JOURNAL OF INTELLIGENT MANUFACTURING, 2005, 16 (4-5) :549-557
[10]  
Chang PC, 2003, INT J IND ENG-THEORY, V10, P55