Modeling the Influence of Disturbances in High-Speed Railway Systems

被引:23
作者
Huang, Ping [1 ,2 ,3 ]
Wen, Chao [1 ,2 ,3 ]
Peng, Qiyuan [1 ,2 ]
Jiang, Chaozhe [1 ,2 ]
Yang, Yuxiang [1 ,2 ]
Fu, Zhuan [4 ]
机构
[1] Southwest Jiaotong Univ, Sch Transportat & Logist, Chengdu 610031, Sichuan, Peoples R China
[2] Southwest Jiaotong Univ, Natl Engn Lab Integrated Transportat Big Data App, Chengdu 610031, Sichuan, Peoples R China
[3] Univ Waterloo, Railway Res Ctr, Waterloo, ON N2L 3G1, Canada
[4] Hainan Railway Co Ltd, Haikou Train Operat Depot, Haikou 570100, Hainan, Peoples R China
关键词
Probability density function - Railroad cars - Railroads - K-means clustering - Probability distributions;
D O I
10.1155/2019/8639589
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Accurately forecasting the influence of disturbances in High-Speed Railways (HSR) has great significance for improving real-time train dispatching and operation management. In this paper, we show how to use historical train operation records to estimate the influence of high-speed train disturbances (HSTD), including the number of affected trains (NAT) and total delayed time (TDT), considering the timetable and disturbance characteristics. We first extracted data about the disturbances and their affected train groups from historical train operation records of Wuhan-Guangzhou (W-G) HSR in China. Then, in order to recognize the concatenations and differences of disturbances, we used a K-Means clustering algorithm to classify them into four categories. Next, parametric and nonparametric density estimation approaches were applied to fit the distributions of NAT and TDT of each clustered category, and the goodness-of-fit testing results showed that Log-normal and Gamma distribution probability densities are the best functions to approximate the distribution of NAT and TDT of different disturbance clusters. Specifically, the validation results show that the proposed models accurately revealed the characteristics of HSTD and that these models can be used in real-time dispatch to predict the NAT and TDT, once the basic features of disturbances are known.
引用
收藏
页数:13
相关论文
共 25 条
[1]  
Goverde R.M. P., 2005, Punctuality of railway operations and timetable stability analysis
[2]  
Hartigan J. A., 1979, Applied Statistics, V28, P100, DOI 10.2307/2346830
[3]   Surgeon performance index: tool for assessment of individual surgical quality in total quality management [J].
Hartrumpf, Martin ;
Claus, Thomas ;
Erb, Michael ;
Albes, Johannes M. .
EUROPEAN JOURNAL OF CARDIO-THORACIC SURGERY, 2009, 35 (05) :751-758
[4]  
Hasan N, 2012, PROCEEDINGS OF THE ASME/ASCE/IEEE JOINT RAIL CONFERENCE, P11
[5]   Modelling delay risks associated with train schedules [J].
Higgins, A ;
Kozan, E ;
Ferreira, L .
TRANSPORTATION PLANNING AND TECHNOLOGY, 1995, 19 (02) :89-108
[6]  
HIGGINS A, 1987, TRANSPORTATION SCIEN, V32, P346
[7]  
Jespersen-Groth J, 2009, LECT NOTES COMPUT SC, V5868, P399, DOI 10.1007/978-3-642-05465-5_18
[8]   Predictive modelling of running and dwell times in railway traffic [J].
Kecman, Pavle ;
Goverde, Rob M. P. .
PUBLIC TRANSPORT, 2015, 7 (03) :295-319
[9]   Data-Enabled Stochastic Modeling for Evaluating Schedule Robustness of Railway Networks [J].
Khadilkar, Harshad .
TRANSPORTATION SCIENCE, 2017, 51 (04) :1161-1176
[10]  
Lessan J., 2018, COMPUTERS IND ENG