共 50 条
- [42] Minicomputer control system for fluidized bed combustion boiler of thermal power plant Kong Zhi Li Lun Yu Ying Yong/Control Theory and Applications, 1995, 12 (06):
- [43] REFRACTORY LINING FOR CYCLONE COMBUSTION CHAMBER OF A POWER PLANT BOILER .I. REFRACTORIES JOURNAL, 1969, (AUG): : 228 - &
- [44] Economic Analysis of the 55 MWe Gedongsongo Geothermal Power Plant Project 2019 9TH INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS (ICPES), 2019,
- [45] Optimization of boiler combustion control system in coal-fired power plant Zhongguo Dianli/Electric Power, 2001, 34 (10):
- [47] Feasibility Analysis of the 55 MWe Gedongsongo Geothermal Power Plant Project 2ND INTERNATIONAL CONFERENCE ON EARTH SCIENCE, MINERAL, AND ENERGY, 2020, 2245
- [48] Immune inspired system for chemical process optimization using the example of a combustion process in a power boiler 2007 INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS APPLICATIONS TO POWER SYSTEMS, VOLS 1 AND 2, 2007, : 553 - +
- [49] Using the fibre optical measurement system for controlling combustion process in power boiler 2004 International Students and Young Scientists Workshop Photonics and Microsystems, Proceedings, 2004, : 71 - 73