Generator Rescheduling for Congestion Management using Firefly Algorithm

被引:0
作者
Gope, Sadhan [1 ]
Goswami, Amp Kumar [2 ]
Tiwari, Prashant Kumar [2 ]
Deb, Subhasish [1 ]
机构
[1] Mizoram Univ, Elect Engn Dept, Aizawl 796004, India
[2] NIT Silchar, Elect Engn Dept, Silchar 788010, Assam, India
来源
2015 INTERNATIONAL CONFERENCE ON ENERGY SYSTEMS AND APPLICATIONS | 2015年
关键词
Generator sensitivity factor; generator rescheduling; transmission congestion management; optimization techniques; firefly algorithm; ELECTRICITY MARKET; VOLTAGE STABILITY; FACTS DEVICES;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In power system operation, congestion management has become more complicated with the increase of system complexity in deregulated environment. That is why, in present scenario of power system congestion management is a complex task of an independent system operator (ISO). In this paper, generator rescheduling is used as a congestion management technique. A recently developed meta heuristic algorithm known as Firefly Algorithm (FA) has been introduced in proposed work. The present work is two folded. Firstly, Generator sensitivity factor (GSF) is calculated to identify the generators participating in congestion management by rescheduling their output. Secondly, FA is introduced to find optimal rescheduling cost of participating generators. Present work is tested on IEEE 39 bus New England Test System.
引用
收藏
页码:40 / 44
页数:5
相关论文
共 50 条
[31]   Performance comparison using firefly and PSO algorithms on congestion management of deregulated power market involving renewable energy sources [J].
Farzana, D. Fathema ;
Mahadevan, K. .
SOFT COMPUTING, 2020, 24 (02) :1473-1482
[32]   Transmission congestion management through sensitivity based rescheduling of generators using improved monarch butterfly optimization [J].
Singh, Vikram ;
Fozdar, Manoj ;
Malik, Hasmat ;
Garcia Marquez, Fausto Pedro .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2023, 145
[33]   Rescheduling-based congestion management scheme using particle swarm optimization with distributed acceleration constants [J].
Yadav, Naresh Kumar .
SOFT COMPUTING, 2019, 23 (03) :847-857
[34]   Optimal Generation Rescheduling for Congestion Management, LMP Enhancement and Social Welfare Maximization [J].
Eladl, Abdelfattah ;
Kaddah, Sahar ;
Haikal, Ebtehag .
2017 NINETEENTH INTERNATIONAL MIDDLE-EAST POWER SYSTEMS CONFERENCE (MEPCON), 2017, :1190-1194
[35]   Circular Antenna Array Synthesis Using Firefly Algorithm [J].
Sharaqa, Ashraf ;
Dib, Nihad .
INTERNATIONAL JOURNAL OF RF AND MICROWAVE COMPUTER-AIDED ENGINEERING, 2014, 24 (02) :139-146
[36]   An improved multi-objective firefly algorithm for energy-efficient hybrid flowshop rescheduling problem [J].
Wang, Ziyue ;
Shen, Liangshan ;
Li, Xinyu ;
Gao, Liang .
JOURNAL OF CLEANER PRODUCTION, 2023, 385
[37]   Congestion Management Considering Wind Energy Sources Using Evolutionary Algorithm [J].
Deb, Subhasish ;
Gope, Sadhan ;
Goswami, Arup Kumar .
ELECTRIC POWER COMPONENTS AND SYSTEMS, 2015, 43 (07) :723-732
[38]   GSA-FAPSO-Based Generators Active Power Rescheduling for Transmission Congestion Management [J].
Peesapati, Rajagopal ;
Yadav, Anamika ;
Yadav, Vinod Kumar ;
Kumar, Niranjan .
IEEE SYSTEMS JOURNAL, 2019, 13 (03) :3266-3273
[39]   Real power performance index and line stability index-based management of contingency using firefly algorithm [J].
Mishra, Akanksha ;
Gundavarapu, Venkata Nagesh Kumar ;
Bathina, Venkateswara Rao ;
Duvvada, Deepak Chowdary .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2016, 10 (10) :2327-2335
[40]   An Efficient Model for Mitigating Power Transmission Congestion Using Novel Rescheduling Approach [J].
Mishra, Swakantik ;
Samal, Sudhansu Kumar .
JOURNAL OF CIRCUITS SYSTEMS AND COMPUTERS, 2023, 32 (14)