Generator Rescheduling for Congestion Management using Firefly Algorithm

被引:0
|
作者
Gope, Sadhan [1 ]
Goswami, Amp Kumar [2 ]
Tiwari, Prashant Kumar [2 ]
Deb, Subhasish [1 ]
机构
[1] Mizoram Univ, Elect Engn Dept, Aizawl 796004, India
[2] NIT Silchar, Elect Engn Dept, Silchar 788010, Assam, India
关键词
Generator sensitivity factor; generator rescheduling; transmission congestion management; optimization techniques; firefly algorithm; ELECTRICITY MARKET; VOLTAGE STABILITY; FACTS DEVICES;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In power system operation, congestion management has become more complicated with the increase of system complexity in deregulated environment. That is why, in present scenario of power system congestion management is a complex task of an independent system operator (ISO). In this paper, generator rescheduling is used as a congestion management technique. A recently developed meta heuristic algorithm known as Firefly Algorithm (FA) has been introduced in proposed work. The present work is two folded. Firstly, Generator sensitivity factor (GSF) is calculated to identify the generators participating in congestion management by rescheduling their output. Secondly, FA is introduced to find optimal rescheduling cost of participating generators. Present work is tested on IEEE 39 bus New England Test System.
引用
收藏
页码:40 / 44
页数:5
相关论文
共 50 条
  • [1] Transmission Congestion Management by Rescheduling of Generator using Slime Mould Algorithm
    Deb, Subhasish
    Datta, Subir
    Lalbiakmuani, R.
    Singh, Kh Premkumar
    PROCEEDINGS OF 2020 6TH IEEE INTERNATIONAL WOMEN IN ENGINEERING (WIE) CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (WIECON-ECE 2020), 2020, : 94 - 97
  • [2] Real Power Rescheduling for Congestion Management with Integration of Wind Farm using Firefly Algorithm
    Deb, Subhasish
    Gope, Sadhan
    Goswami, Arup Kumar
    2015 INTERNATIONAL CONFERENCE ON ENERGY, POWER AND ENVIRONMENT: TOWARDS SUSTAINABLE GROWTH (ICEPE), 2015,
  • [3] Congestion Management by Generator Real Power Rescheduling using Flower Pollination Algorithm
    Deb, Subhasish
    Goswami, Arup Kumar
    2016 2ND INTERNATIONAL CONFERENCE ON CONTROL, INSTRUMENTATION, ENERGY & COMMUNICATION (CIEC), 2016, : 437 - 441
  • [4] Rescheduling of real power for congestion management with integration of pumped storage hydro unit using firefly algorithm
    Gope, Sadhan
    Goswami, Arup Kumar
    Tiwari, Prashant Kumar
    Deb, Subhasish
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 83 : 434 - 442
  • [5] Generator Rescheduling for Congestion Management with Incorporation of Wind Farm using Artificial Bee Colony Algorithm
    Deb, Subhasish
    Gope, Sadhan
    Goswami, Arup Kumar
    2013 ANNUAL IEEE INDIA CONFERENCE (INDICON), 2013,
  • [6] Active Power Rescheduling of Generator for Congestion Management using Whale Optimization Technique
    Borkar, Preeti
    Kumar, Niranjan
    Choudhary, Durgesh
    2018 INTERNATIONAL CONFERENCE ON SMART ELECTRIC DRIVES AND POWER SYSTEM (ICSEDPS), 2018, : 142 - 146
  • [7] Congestion Management by Generator Rescheduling using Artificial Bee Colony Optimization Technique
    Deb, Subhasish
    Goswami, Arup Kumar
    2012 ANNUAL IEEE INDIA CONFERENCE (INDICON), 2012, : 909 - 914
  • [8] Rescheduling of Real Power for Congestion Management using Cuckoo Search Algorithm
    Deb, Subhasish
    Goswami, Arup Kumar
    2014 ANNUAL IEEE INDIA CONFERENCE (INDICON), 2014,
  • [9] Transmission Congestion Management Using Generator Sensitivity Factors for Active and Reactive Power Rescheduling Using Particle Swarm Optimization Algorithm
    Ogunwole, Emmanuel Idowu
    Krishnamurthy, Senthil
    IEEE ACCESS, 2022, 10 : 122882 - 122900
  • [10] Firefly algorithm for congestion management in deregulated environment
    Verma, Sumit
    Mukherjee, V.
    ENGINEERING SCIENCE AND TECHNOLOGY-AN INTERNATIONAL JOURNAL-JESTECH, 2016, 19 (03): : 1254 - 1265