Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints

被引:32
作者
Xie, Mengfei [1 ]
Zhou, Jianzhong [1 ]
Li, Chunlong [1 ]
Lu, Peng [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China
关键词
Daily hydro-generation scheduling; Peak shaving demands; Joint peak load regulation; Discrete differential dynamic programming; Progressive optimality algorithm; Hydro-unit commitment; DIFFERENTIAL EVOLUTION ALGORITHM; UNIT COMMITMENT PROBLEM; LAGRANGIAN-RELAXATION; OPTIMAL OPERATION; POWER GRIDS; OPTIMIZATION; SYSTEMS; CHINA; STATIONS;
D O I
10.1061/(ASCE)WR.1943-5452.0000622
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper considers the operation of hydro plants, tackles the problem of daily hydro-generation scheduling (DHGS), and obtains the optimal hourly operation of cascade hydropower reservoirs. To meet the practical operational demands of power grid, an improved benefit-maximization model in which the peak shaving demands are taken as constraints is proposed for DHGS, and the joint peak load regulation (JPLR) method is applied to the proposed model. The model can enhance the power-generation efficiency and reduce the water spillage significantly under the condition of peak load regulation. Meanwhile, a hybrid method that combines discrete differential dynamic programming with progressive optimality algorithm is proposed to solve the JPLR problem. The complicated constraints can be handled by the proposed algorithm effectively. Moreover, the hydro-unit-commitment problem is solved by a rapid searching algorithm based on equal incremental principle and empirical methods. With this unit-commitment strategy, the computation speed can be accelerated and approximate optimal solutions can be obtained in a reasonable time frame. The proposed model and methods are applied to the DHGS of cascade hydro plants in Zagunao River in China and achieve good performance.
引用
收藏
页数:11
相关论文
共 33 条
  • [31] The energy situation and its sustainable development strategy in China
    Zhang, Na
    Lior, Noam
    Jin, Hongguang
    [J]. ENERGY, 2011, 36 (06) : 3639 - 3649
  • [32] Optimal Operation of Large-Scale Cascaded Hydropower Systems in the Upper Reaches of the Yangtze River, China
    Zhang, Rui
    Zhou, Jianzhong
    Zhang, Huifeng
    Liao, Xiang
    Wang, Xuemin
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (04) : 480 - 495
  • [33] Improved Dynamic Programming for Hydropower Reservoir Operation
    Zhao, Tongtiegang
    Zhao, Jianshi
    Yang, Dawen
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (03) : 365 - 374