Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints

被引:33
作者
Xie, Mengfei [1 ]
Zhou, Jianzhong [1 ]
Li, Chunlong [1 ]
Lu, Peng [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China
关键词
Daily hydro-generation scheduling; Peak shaving demands; Joint peak load regulation; Discrete differential dynamic programming; Progressive optimality algorithm; Hydro-unit commitment; DIFFERENTIAL EVOLUTION ALGORITHM; UNIT COMMITMENT PROBLEM; LAGRANGIAN-RELAXATION; OPTIMAL OPERATION; POWER GRIDS; OPTIMIZATION; SYSTEMS; CHINA; STATIONS;
D O I
10.1061/(ASCE)WR.1943-5452.0000622
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper considers the operation of hydro plants, tackles the problem of daily hydro-generation scheduling (DHGS), and obtains the optimal hourly operation of cascade hydropower reservoirs. To meet the practical operational demands of power grid, an improved benefit-maximization model in which the peak shaving demands are taken as constraints is proposed for DHGS, and the joint peak load regulation (JPLR) method is applied to the proposed model. The model can enhance the power-generation efficiency and reduce the water spillage significantly under the condition of peak load regulation. Meanwhile, a hybrid method that combines discrete differential dynamic programming with progressive optimality algorithm is proposed to solve the JPLR problem. The complicated constraints can be handled by the proposed algorithm effectively. Moreover, the hydro-unit-commitment problem is solved by a rapid searching algorithm based on equal incremental principle and empirical methods. With this unit-commitment strategy, the computation speed can be accelerated and approximate optimal solutions can be obtained in a reasonable time frame. The proposed model and methods are applied to the DHGS of cascade hydro plants in Zagunao River in China and achieve good performance.
引用
收藏
页数:11
相关论文
共 33 条
[1]   Experiences with mixed integer linear programming based approaches on short-term hydro scheduling [J].
Chang, GW ;
Aganagic, M ;
Waight, JG ;
Medina, J ;
Burton, T ;
Reeves, S ;
Christoforidis, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) :743-749
[2]   Research and Application of Multidimensional Dynamic Programming in Cascade Reservoirs Based on Multilayer Nested Structure [J].
Ji, Changming ;
Jiang, Zhiqiang ;
Sun, Ping ;
Zhang, Yanke ;
Wang, Liping .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2015, 141 (07)
[3]   Short-term peak shaving operation for multiple power grids with pumped storage power plants [J].
Cheng, Chun-Tian ;
Cheng, Xiong ;
Shen, Jian-Jian ;
Wu, Xin-Yu .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 67 :570-581
[4]   A hybrid method of incorporating extended priority list into equal incremental principle for energy-saving generation dispatch of thermal power systems [J].
Cheng, Chuntian ;
Li, Shushan ;
Li, Gang .
ENERGY, 2014, 64 :688-696
[5]   Short-Term Hydroscheduling with Discrepant Objectives Using Multi-Step Progressive Optimality Algorithm [J].
Cheng, Chuntian ;
Shen, Jianjian ;
Wu, Xinyu ;
Chau, Kwok-wing .
JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2012, 48 (03) :464-479
[6]   Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head [J].
Cheng, Chuntian ;
Shen, Jianjian ;
Wu, Xinyu .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2012, 138 (03) :257-267
[7]  
Finardi EC, 2005, COMPUT APPL MATH, V24, P317
[8]   A comparative analysis of different dual problems in the Lagrangian Relaxation context for solving the Hydro Unit Commitment problem [J].
Finardi, Erlon Cristian ;
Scuzziato, Murilo Reolon .
ELECTRIC POWER SYSTEMS RESEARCH, 2014, 107 :221-229
[9]   Short-term hydropower optimal scheduling considering the optimization of water time delay [J].
Ge, Xiao-lin ;
Zhang, Li-zi ;
Shu, Jun ;
Xu, Nai-fan .
ELECTRIC POWER SYSTEMS RESEARCH, 2014, 110 :188-197
[10]   Parallel Self-Adaptive Differential Evolution Algorithm for Solving Short-Term Hydro Scheduling Problem [J].
Glotic, Arnel ;
Glotic, Adnan ;
Kitak, Peter ;
Pihler, Joze ;
Ticar, Igor .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (05) :2347-2358