A study on risk management for the private enterprises investing in expressway BOT project

被引:0
|
作者
Xiong, Xiaoguo [1 ]
机构
[1] Guangxi Univ, Sch Business, Nanning 530004, Peoples R China
来源
PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT | 2011年
关键词
BOT; expressway project; risk management; private enterprise;
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In recent years, the expressway construction attained considerable increase in China. Instead of the single mode of "government investment and operation", innovations of various modes are implemented in the management and financing system of expressway constructions, covering the diversified sources of investment, the financing channels and methods, a transfer of the right of toll collection. The BOT project is one of the most popular practice mode in private financial initiative modes. However, there are some investment risks and issues in implementing expressway BOT project. Targeting at minimizing various investment risks and ensuring the benefits of investors, the article tries to analyze more effective risk management modes of expressway BOT project from the perspective of private enterprise, which will have practical significance for the development of expressway construction in China.
引用
收藏
页码:451 / 454
页数:4
相关论文
共 50 条
  • [1] Study on the Risk Management of Expressway BOT Project
    Wang Shufang
    Yang Chengzhong
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88
  • [2] Research of Risk Management on XY Expressway BOT Project
    Wang, Qiu-ju
    Xue, Da-shen
    INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND SOFTWARE ENGINEERING (AISE 2014), 2014, : 271 - 276
  • [3] Study on the Mechanism of Expressway BOT Project Rate Determination
    Mu, Yi
    2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 26 : 718 - 722
  • [4] The research of risk management of BOT investment project
    Chen Ling
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 964 - 967
  • [5] Risk Assessment of Expressway BOT Project Based on Grey Hierarchy Theory
    Hu Yuting
    Mu Lan
    Liu Zhanliang
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 16 - +
  • [6] Evaluation Research on policy risk of BOT project in Expressway Based on Structural Equation
    Bing, Xu
    Lu, Liu
    REGIONAL DEVELOPMENT AND RISK MANAGEMENT IN THE WEST OF CHINA, 2012, : 165 - 171
  • [7] Study on the Model of Integrated Risk Management for BOT Projects
    Jiang, Gongliang
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3374 - 3377
  • [8] Project Risk Management Practices: An Exploratory Study of Emirati Public and Private Projects
    Ajmal, Mian M.
    Jabeen, Fauzia
    Saber, Hussein
    SUSTAINABLE ECONOMIC GROWTH, EDUCATION EXCELLENCE, AND INNOVATION MANAGEMENT THROUGH VISION 2020, VOLS I-VII, 2017, : 165 - 182
  • [9] Total Quality Management in BOT Project
    Wang Xuan
    Zhao Ping
    CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 1298 - 1302
  • [10] THE LIFE CYCLE INTEGRATED RISK ANALYSIS AND MANAGEMENT OF INVESTMENT IN BOT METRO PROJECT
    Mao, Yihua
    Xiang, Jianguo
    Cheng, Yanhong
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2415 - 2422