Interconnection-wide hour-ahead scheduling in the presence of intermittent renewables and demand response: A surplus maximizing approach

被引:17
作者
Behboodi, Sahand [1 ,2 ]
Chassin, David P. [1 ,2 ,3 ]
Djilali, Ned [1 ,2 ,4 ]
Crawford, Curran [1 ,2 ]
机构
[1] Univ Victoria, Inst Integrated Energy Syst, Victoria, BC, Canada
[2] Univ Victoria, Dept Mech Engn, Victoria, BC, Canada
[3] SLAC Natl Accelerator Lab, Menlo Pk, CA USA
[4] King Abdulaziz Univ, Renewable Energy Res Grp, Jeddah, Saudi Arabia
关键词
Demand response; Energy market; Renewable intermittency; Resource allocation; Western interconnection; VALIDATION; NETWORKS; MARKET;
D O I
10.1016/j.apenergy.2016.12.052
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper describes a new approach for solving the multi-area electricity resource allocation problem when considering both intermittent renewables and demand response. The method determines the hourly inter-area export/import set that maximizes the interconnection (global) surplus satisfying transmission, generation and load constraints. The optimal inter-area transfer set effectively makes the electricity price uniform over the interconnection apart from constrained areas, which overall increases the consumer surplus more than it decreases the producer surplus. The method is computationally efficient and suitable for use in simulations that depend on optimal scheduling models. The method is demonstrated on a system that represents North America Western Interconnection for the planning year of 2024. Simulation results indicate that effective use of interties reduces the system operation cost substantially. Excluding demand response, both the unconstrained and the constrained scheduling solutions decrease the global production cost (and equivalently increase the global economic surplus) by $12.30B and $10.67B per year, respectively, when compared to the standalone case in which each control area relies only on its local supply resources. This cost saving is equal to 25% and 22% of the annual production cost. Including 5% demand response, the constrained solution decreases the annual production cost by $10.70B, while increases the annual surplus by $9.32B in comparison to the standalone case. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:336 / 351
页数:16
相关论文
共 38 条
  • [1] [Anonymous], 2007, PACIFIC NW GRIDWIS 1
  • [2] [Anonymous], 2006, TECH REP
  • [3] [Anonymous], 2011, IEEE POWER ENERGY SO
  • [4] Renewable resources portfolio optimization in the presence of demand response
    Behboodi, Sahand
    Chassin, David P.
    Crawford, Curran
    Djilali, Ned
    [J]. APPLIED ENERGY, 2016, 162 : 139 - 148
  • [5] Boyd S, 2004, CONVEX OPTIMIZATION
  • [6] Modeling framework and validation of a smart grid and demand response system for wind power integration
    Broeer, Torsten
    Fuller, Jason
    Tuffner, Francis
    Chassin, David
    Djilali, Ned
    [J]. APPLIED ENERGY, 2014, 113 : 199 - 207
  • [7] Agent-Based Simulation for Interconnection-Scale Renewable Integration and Demand Response Studies
    Chassin, David P.
    Behboodi, Sahand
    Crawford, Curran
    Djilali, Ned
    [J]. ENGINEERING, 2015, 1 (04) : 422 - 435
  • [8] Aggregate modeling of fast-acting demand response and control under real-time pricing
    Chassin, David P.
    Rondeau, Daniel
    [J]. APPLIED ENERGY, 2016, 181 : 288 - 298
  • [9] EPEX SPOT, EUR POW EXCH
  • [10] CONTRACT NETWORKS FOR ELECTRIC-POWER TRANSMISSION
    HOGAN, WW
    [J]. JOURNAL OF REGULATORY ECONOMICS, 1992, 4 (03) : 211 - 242