机构:
Univ Pitesti, Dept Mfg & Ind Management, Pitesti, RomaniaUniv Pitesti, Dept Mfg & Ind Management, Pitesti, Romania
Gavriluta, Alin
[1
]
Gavriluta, Ana
论文数: 0引用数: 0
h-index: 0
机构:
Univ Pitesti, Dept Mfg & Ind Management, Pitesti, RomaniaUniv Pitesti, Dept Mfg & Ind Management, Pitesti, Romania
Gavriluta, Ana
[1
]
Nitu, Eduard-Laurentiu
论文数: 0引用数: 0
h-index: 0
机构:
Univ Pitesti, Dept Mfg & Ind Management, Pitesti, RomaniaUniv Pitesti, Dept Mfg & Ind Management, Pitesti, Romania
Nitu, Eduard-Laurentiu
[1
]
Schutz, Jeremie
论文数: 0引用数: 0
h-index: 0
机构:
Univ Lorraine, EA 3096, LGIPM, F-57045 Metz, FranceUniv Pitesti, Dept Mfg & Ind Management, Pitesti, Romania
Schutz, Jeremie
[2
]
机构:
[1] Univ Pitesti, Dept Mfg & Ind Management, Pitesti, Romania
[2] Univ Lorraine, EA 3096, LGIPM, F-57045 Metz, France
来源:
21ST INNOVATIVE MANUFACTURING ENGINEERING & ENERGY INTERNATIONAL CONFERENCE - IMANE&E 2017
|
2017年
/
112卷
关键词:
D O I:
10.1051/matecconf/201711206020
中图分类号:
TE [石油、天然气工业];
TK [能源与动力工程];
学科分类号:
0807 ;
0820 ;
摘要:
The design of a supply system for an assembly line possess many challenges. A tool that helps the decision making and the adjustment of the supply system parameters is the dynamic simulation. This article has the aim of showing on a given case, the road from workstation layout, to its simulation model and an example of parameter that can vary and its effect of workstation performance. Starting from the 3D model of the workstation, varying the number of diversities present in the workstation, by using the simulation we can see the effect of this variation on the workstation cycle time.