DC Power Flow Revisited

被引:690
作者
Stott, Brian [1 ]
Jardim, Jorge [1 ]
Alsac, Ongun [1 ]
机构
[1] Nexant Inc, Software & Informat Syst Unit, Chandler, AZ 85226 USA
关键词
Congestion revenue rights; contingency analysis; dc power flow; economic dispatch; financial transmission rights; LMP pricing; unit commitment;
D O I
10.1109/TPWRS.2009.2021235
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Linear MW-only "dc" network power flow models are in widespread and even increasing use, particularly in congestion-constrained market applications. Many versions of these approximate models are possible. When their MW flows are reasonably correct (and this is by no means assured), they can often offer compelling advantages. Given their considerable importance in today's electric power industry, dc models merit closer scrutiny. This paper attempts such a re-examination.
引用
收藏
页码:1290 / 1300
页数:11
相关论文
共 36 条
  • [1] Alsac O., 2004, IEEE Power & Energy Magazine, V2, P47, DOI 10.1109/MPAE.2004.1310873
  • [2] ALVARADO FL, 1991, ADV ELECT POWER ENER
  • [3] [Anonymous], 1931, GEN ELECT REV INCOME
  • [4] [Anonymous], 1999, DISTR TASK FORC M MA
  • [5] Variation of distribution factors with loading
    Baldick, R
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (04) : 1316 - 1323
  • [6] Baldick R, 2005, IEEE POWER ENG SOC, P221
  • [7] CASAZZA JA, 1954, P AM POW C, V16, P447
  • [8] PTDF-based power system equivalents
    Cheng, X
    Overbye, TJ
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) : 1868 - 1876
  • [9] DUTHALER C, 2008, P 16 PSCC GLASG UK J
  • [10] *EPRI, 1992, DEV PROD GRAD SOFTW