共 50 条
- [45] A survey study on industrial construction project supply chain: on time performance and practices of structural steel and pipe spools CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 653 - 659
- [48] The Impact of the Learning and Forgetting Effect on the Cost of a Multi-Unit Construction Project with the Use of the Simulated Annealing Algorithm APPLIED SCIENCES-BASEL, 2022, 12 (24):
- [49] Integrated management and optimization of construction project schedule, cost and quality 2018 INTERNATIONAL WORKSHOP ON ADVANCES IN SOCIAL SCIENCES (IWASS 2018), 2019, : 622 - 625