Assessing maintenance strategies for cutting tool replacements in mechanized tunneling using process simulation

被引:16
作者
Conrads, Alena [1 ]
Scheffer, Markus [2 ]
Mattern, Hannah [2 ]
Koenig, Markus [2 ]
Thewes, Markus [1 ]
机构
[1] Ruhr Univ Bochum, Inst Tunneling & Construct Management, Fac Civil & Environm Engn, Bldg IC 6-137,Univ 150, D-44801 Bochum, Germany
[2] Ruhr Univ Bochum, Chair Comp Engn, Fac Civil & Environm Engn, Bochum, Germany
关键词
maintenance; simulation; engineering; planning; tunneling; CUTTER WEAR PREDICTION; MODEL;
D O I
10.1057/s41273-016-0046-5
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In mechanized tunneling, detailed planning with an accurate performance prediction of the tunnel boring machine (TBM) is needed for a successful tunnel project. Undersized logistical components, disturbances of the supply chain, as well as negligence of maintenance schedules reduce the TBM performance and frequently lead to avoidable times of standstill. This paper presents a performance forecast model for mechanized tunneling projects focusing on wear and maintenance processes of the cutting tools. The developed simulation model has been implemented in the simulation environment AnyLogic using the multi-method approach, including agent-based modeling as well as discrete-event and system dynamic simulation. The model can be used to evaluate different maintenance strategies for a tunneling project. Thus, an improved maintenance strategy for reducing the time of standstill can be found.
引用
收藏
页码:51 / 61
页数:11
相关论文
共 27 条
[1]  
AbouRizk S. M., 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. `Simulation - A Bridge to the Future' (Cat. No.99CH37038), P948, DOI 10.1109/WSC.1999.816804
[2]   Role of Simulation in Construction Engineering and Management [J].
AbouRizk, Simaan .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (10) :1140-1153
[3]   Using Simulation to Plan Tunnel Construction [J].
Al-Bataineh, Mohammed ;
AbouRizk, Simaan ;
Parkis, Holly .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (05) :564-571
[4]   Productivity simulation during the planning phase of the glencoe tunnel in calgary, canada: A case study [J].
AL-Battaineh, Hussien T. ;
AbouRizk, Simaan ;
Tan, James ;
Fernando, Siri .
PROCEEDINGS OF THE 2006 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2006, :2087-+
[5]  
Beer G., 2003, NUMERICAL SIMULATION
[6]  
DIN, 2001, 13306 DIN EN
[7]   Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain [J].
Ebrahimy, Yasser ;
AbouRizk, Simaan ;
Fernando, Siri ;
Mohamed, Yasser .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2011, 18 (05) :462-+
[8]   Simphony Supply Chain Simulator: a simulation toolkit to model the supply chain of construction projects [J].
Ebrahimy, Yasser ;
AbouRizk, Simaan M. ;
Fernando, Siri ;
Mohamed, Yasser .
SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2011, 87 (08) :657-667
[9]  
Gamma E, 2014, DESIGN PATTERNS ELEM
[10]   Introduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel, Iran [J].
Hassanpour, J. ;
Rostami, J. ;
Azali, S. Tarigh ;
Zhao, J. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 43 :222-231