Solving the integrated forest harvest scheduling model using metaheuristic algorithms

被引:3
|
作者
Naderializadeh, Nader [1 ]
Crowe, Kevin A. [1 ]
Rouhafza, Melika [1 ]
机构
[1] Lakehead Univ, Fac Nat Resources Management, 955 Oliver Rd, Thunder Bay, ON P7B 5E1, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Forest management planning; Harvest-scheduling model; Fixed charge network design model; Simulated annealing; Integrated model; SEARCH; OPTIMIZATION; CONSTRAINTS; HEURISTICS; DESIGN;
D O I
10.1007/s12351-020-00612-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In forestry, the highest operational costs arise from the construction of forest roads and the transportation of harvested wood. Hence, optimization models have been used at the tactical level of planning to reduce these costs by integrating decisions on: (1) the allocation of harvest-blocks, (2) the allocation of access roads to these blocks, and (3) the transportation costs that result from the latter two decisions. The integration of these three decisions, in one optimization model, has been referred to as the integrated model. The integrated model, when binary decision variables are used to represent the cut-blocks and roads, is NP-hard and has been solved using two approaches: exact and metaheuristic algorithms. Unlike exact methods, metaheuristic algorithms have thus far not solved the integrated model, but have solved models which either exclude transportation costs from the objective function, or solve the model sequentially. This is a significant gap in prior research because exact solution methods can only be used on smaller forests and metaheuristic algorithms have therefore been used to solve the tactical forest planning problem, without the integration of transportation costs, on large forests. This failure to integrate transportation costs, on a large scale, is the major economic consequence of this gap. The objective of this paper is to present and evaluate a new solution procedure in which all three elements of the integrated tactical planning model are included in the objective function and solved using metaheuristics. The solution procedure was applied to three forests and the attributes and qualities of the solutions were compared to near-optimal solution values generated using an exact solution approach. The results indicate that this metaheuristic procedure generated good quality solutions. We conclude that this research is a useful first step in representing transportation costs in the integrated tactical planning models to be solved using metaheuristics.
引用
收藏
页码:2437 / 2463
页数:27
相关论文
共 50 条
  • [21] Solving multiprocessor scheduling problem with GEO metaheuristic
    Switalski, Piotr
    Seredynski, Franciszek
    2009 IEEE INTERNATIONAL SYMPOSIUM ON PARALLEL & DISTRIBUTED PROCESSING, VOLS 1-5, 2009, : 2214 - +
  • [22] Solving the area-restricted harvest-scheduling model using the branch and bound algorithm
    Crowe, K
    Nelson, J
    Boyland, M
    CANADIAN JOURNAL OF FOREST RESEARCH-REVUE CANADIENNE DE RECHERCHE FORESTIERE, 2003, 33 (09): : 1804 - 1814
  • [23] Hard-deadline constrained workflows scheduling using metaheuristic algorithms
    Visheratin, Alexander
    Melnik, Mikhail
    Butakov, Nikolay
    Nasonov, Denis
    4TH INTERNATIONAL YOUNG SCIENTIST CONFERENCE ON COMPUTATIONAL SCIENCE, 2015, 66 : 506 - 514
  • [24] Combining Metaheuristic Algorithms to Solve a Scheduling Problem
    Belen Vaquerizo, Ma
    Baruque, Bruno
    Corchado, Emilio
    HYBRID ARTIFICIAL INTELLIGENT SYSTEMS, PT II, 2012, 7209 : 381 - 391
  • [25] Metaheuristic algorithms for the hybrid flowshop scheduling problem
    Oztop, Hande
    Tasgetiren, M. Fatih
    Eliiyi, Deniz Tursel
    Pan, Quan-Ke
    COMPUTERS & OPERATIONS RESEARCH, 2019, 111 : 177 - 196
  • [26] Solving timetable scheduling problem using genetic algorithms
    Sigl, B
    Golub, M
    Mornar, V
    ITI 2003: PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY INTERFACES, 2003, : 519 - 524
  • [27] Solving Resource-Constrained Project Scheduling Problem Using Metaheuristic Algorithm
    Munlin, Mudarmeen
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC ENGINEERING (ICEEE), 2018, : 344 - 349
  • [28] Using a metaheuristic algorithm for solving a home health care routing and scheduling problem
    Manavizadeh, Neda
    Farrokhi-Asl, Hamed
    Beiraghdar, Parya
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (01) : 27 - 40
  • [29] Approaches for Addressing Spatial Connectivity of Final Harvests Within Forest Harvest Scheduling Algorithms
    Bettinger, Pete
    GEOGRAPHICAL INFORMATION SYSTEMS THEORY, APPLICATIONS AND MANAGEMENT, GISTAM 2023, 2024, 2107 : 54 - 68
  • [30] Solving multi-objective functions for cancer treatment by using Metaheuristic Algorithms
    Heydarpoor, Farid
    Karbassi, Seyed Mehdi
    Bidabadi, Narges
    Ebadi, Mohammad Javad
    INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2020, 11 (03): : 61 - 75